Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Fossil Energy›Quadrant presses on with Phoenix South well drilling
Fossil Energy

May 11, 2018 · about 8 years ago

Quadrant presses on with Phoenix South well drilling

Quadrant Energy has drilled the Phoenix South-3 well offshore Australia past the 3,000-meter measured depth mark.

2 minutes read
  • LinkedIn
  • X
  • Email

Quadrant Energy has installed the blowout preventer and drilled the Phoenix South-3 well off Australia past the 3,000-meter measured depth mark.

Quadrant is the operator of the Phoenix project off Western Australia with an 80% interest and Carnarvon Petroleum is its partner with the remaining 20% interest.

After a short delay caused by weather, the Transocean-owned GSF Development Driller-1 semi-submersible rig arrived on site in early April. The well was spud later that month.

Carnarvon said on Friday that the 20” casing was set and cemented in place, the blowout preventer (BOP) installed and pressure tested. The company added that drilling began in a 17 ½” hole. The well is currently drilling ahead in 17 ½” hole at 3,114 meters measured depth.

According to Carnarvon, it will take around another week to finish drilling this section of the hole to approximately 3,700 meters after which a 13 5/8” casing will be set.

Also, a number of hole sections will be drilled prior to the primary Caley target section which is expected to be intersected at a depth of approximately 5,300 meters.

The primary objective for the Phoenix South-3 well is to evaluate the gas and condensate potential of the Caley Member within a large, faulted anti-clinal closure that was partially penetrated with the Phoenix South-2 well.

Phoenix South-2 encountered gas and condensate in the Caley Member but was unable to drill through and evaluate the formation. The Phoenix South-3 well has been designed to penetrate and evaluate the hydrocarbon bearing formations of the Caley Member.

Phoenix South-3 is located around 560 meters North-North East of the Phoenix South-2 well. The well will target a closure that is estimated by Carnarvon to contain a gross mean recoverable prospective resource of 489 Bscf of gas and 57 million barrels of associated condensate (being 143 million barrels of oil equivalent (boe), gross, Pmean).

The well is also expected to encounter sandstones within the Hove Member that may be hydrocarbon bearing.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Fossil EnergyExploration & ProductionProject & Tenders

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1More work with Petrobras increases Brazilian firm's backlog to over $2 billion
  2. 2Yinson Production achieves industry-first non-Brazil FPSO project bond at $1.46 billion
  3. 3Golar secures 2013-built LNG carrier for conversion into fourth FLNG
  4. 4Lamprell tasks IMI with offshore platform and jacket fabrication scope

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free