
Brava Energia has obtained the required approval to deploy a floating production, storage, and offloading (FPSO) vessel for operations off the coast of Brazil and is now waiting to get a green light to start production at an oil field in the Santos Basin, where this FPSO will be in operation.

BP has tapped the American Bureau of Shipping (ABS) for a batch of services related to its floating production unit (FPU), which is destined to work at its sixth-operated deepwater project in a prolific high-margin basin within the U.S. Gulf of Mexico.