
Dutch shipbuilder and designer Neptune Marine has launched the hull of the dual-fuel cable installation and repair vessel destined for compatriot N-Sea Group. The hull of the 100-meter-long cable-laying vessel (CLV) Altera hit the water last weekend, starting its journey from the shipyard in Poland

A 1986-built floating production, storage, and offloading (FPSO) vessel has arrived at a shipyard in Tenerife, which is part of Spain and the largest of the Canary Islands in the Atlantic Ocean. This unit has lined up for an assignment at two oilfields off the coast of Timor-Leste in Southeast Asia.