Business & Finance
Boxship Stadt Dresden Suffers Main Engine Issues in Venice
The containership Stadt Dresden experienced main engine issues while berthing in Venice, Hapag-Lloyd informed.
Greenlink Wins €3.6M EU Funding
Greenlink Interconnector has been awarded a €3.6-million funding by the European Commission to finance the development of the project. Greenlink was selected for a grant in the field of trans-European energy infrastructure under the Connecting Europe Facility (CEF Energy). Simon Ludlam, Project Dire
Nordic American Tankers Shrinks Quarterly Loss
NAT wrapped up the fourth quarter of this year with a net loss of USD 10.5 million.
Sebastian Inlet Dredging Moves Ahead
Dredging works to remove approximately 150,000 cubic yards of sand from the Sebastian Inlet in Florida are moving ahead, Sebastian Inlet District said in its latest announcement. Ferreira Construction of Stuart, Florida, has been using its 18-inch hydraulic dredger Lori Hill, equipped with Hypack so
The Crown Estate Collects Round 4 Feedback
The Crown Estate is reviewing the feedback on its proposals for the fourth round of offshore wind leasing in the UK, which will help finalize the plans. An update on the plans will be shared before a proposed launch and once The Crown Estate reviews all the feedback from the market and shareholders
SembMarine: Offshore spending rising, but not for new rigs. New orders expected in production units segment
Singapore’s offshore platform and rig builder Sembcorp Marine sees improvements in global spending on offshore exploration and production, however, it does not expect this to reflect on its near-term business volume.
Vale Prepares for Paraopeba River Dredging
Vale, a Brazilian mining company, is moving ahead with emergency projects to implement measures for containing the tailings coming from Dam I of the Córrego do Feijão Mine, located in Brumadinho, Minas Gerais, Brazil. In Section 1 of the plan, in the affected 10-km stretch that extends from Dam 1 to
Oceaneering bags two-year Tyra job
Oceaneering has been awarded an integrity management deal with Total to support its Tyra redevelopment project in the Danish North Sea.
Karsten Moholt wins framework agreement with Equinor
Norway’s Karsten Moholt has been awarded a framework agreement for condition monitoring, service and repair of rotating electrical and pertaining equipment on all of Equinor’s installations.
PHOTO: Dinish Wharf Extension Works Move Ahead
The Dinish Wharf extension scheme, located on Dinish Island, Castletownbere and undertaken by L&M Keating Ltd., is moving forward. In addition to doubling of the Dinish Island facility through the provision of 216 meters of extra landing berth, the project will deliver approximately 2.2 acres of hig
USACE Hosts Dredging Meeting in Winona, Minnesota
The U.S. Army Corps of Engineers, St. Paul District, is set to host a public meeting to gather public input into its planning efforts to manage Mississippi River dredged material in Winona, Minnesota, on February 21. The meeting is scheduled from 6-8 p.m. at the Winona County History Center, 160 Joh
RMV Riding Park Dredging Project Proposed
The U.S. Army Corps of Engineers, Los Angeles District, has received an application for a Department of the Army permit for the RMV Riding Park Recurrent Maintenance Dredging project. The proposed project is located within the city of San Juan Capistrano, Orange County, CA. According to the applican
Forum Makes Management Changes
Forum Energy Technologies has promoted John C. Ivascu to serve as senior vice president, general counsel and secretary, effective February 15, 2019. In addition, James L. McCulloch, Forum’s general counsel since 2010, has transitioned to serve as chief compliance officer and as an advisor to the chi
Works Resume on Kopeopeo Canal Dredging Project
Work on the Kopeopeo Canal Remediation Project continues as dredging of the canal resumes and water treatment works move to the second containment site at the Whakatāne River end of the Kopeopeo Canal. According to the Deputy Project Manager, Ken Tarboton, moving to the new containment site off Keep