Advertisement

Business & Finance

TTS to Equip Ro-Ro Vessel ‘Sigrid’ (Sweden)
Business & Finance

TTS to Equip Ro-Ro Vessel ‘Sigrid’ (Sweden)

TTS has supplied an electric operated stern ramp/door on the specialized Ro-Ro vessel “m/s Sigrid” for the Swedish shipowner SKB. In late June this year Damen Shipyards, Gorinchem, in the Netherlands and its Galati yard in Romania will deliver their newbuilding H1226, to its owner SKB, Swedish Nucle

about 13 years ago
Kongsberg Completes Bridge and Automation Retrofit on ‘Saipem 7000’
Business & Finance

Kongsberg Completes Bridge and Automation Retrofit on ‘Saipem 7000’

Kongsberg Maritime has completed the installation and commissioning of an integrated bridge and automation solution during a large-scale retrofit of the Saipem 7000, an advanced Semi-submersible crane and pipelaying (J-lay) DP3 vessel. The project to equip Saipem 7000 with the latest advanced offsho

about 13 years ago
Installation of Permanent Reservoir Monitoring System on Snorre Field Off Norway
Business & Finance

Installation of Permanent Reservoir Monitoring System on Snorre Field Off Norway

From 20 June to 20 October, a seismic streamer will be installed on the Snorre field in the North Sea. Trawling activity in the area should be avoided during this period. During the period when the streamer is lying exposed on the seabed, before it is covered, it is extremely vulnerable to any type

about 13 years ago
PSA Norway Inspects Leak at Statoil’s Oseberg A
Business & Finance

PSA Norway Inspects Leak at Statoil’s Oseberg A

The Petroleum Safety Authority Norway (PSA) has decided to initiate an investigation of the hydrocarbon leak that took place on the Oseberg A platform on 17 June 2013. The hydrocarbon leak occurred just after 07.00 hours on Monday, 17 June, in the M03 main deck area on the Statoil-operated process a

about 13 years ago
Ichthys FPSO Construction Begins in South Korea
Business & Finance

Ichthys FPSO Construction Begins in South Korea

The INPEX-operated Ichthys LNG Project (the Project) cut first steel for the hull of its Floating Production, Storage and Offloading (FPSO) facility in Okpo, Korea. With fabrication of the hull underway, work on all of the Project’s major offshore facilities has commenced. The FPSO is being built by

about 13 years ago

Advertisement

InterManager Calls for Restraint Following Entry into Force of MLC
Business & Finance

InterManager Calls for Restraint Following Entry into Force of MLC

InterManager, the international association of in-house and third party ship managers, is calling on flag States to exercise tolerance and flexibility in the weeks and months following the entry into force of the Maritime Labour Convention. A poll of its member companies shows that InterManager memb

about 13 years ago
Subsea 7 Orders Deepwater Lowering System from Caley
Business & Finance

Subsea 7 Orders Deepwater Lowering System from Caley

Handling systems specialist, Caley Ocean Systems has been awarded a contract by Subsea 7 to design, manufacture and supply a deepwater lowering system (DLS). The DLS will initially be deployed by Subsea 7 on the Chevron-operated Gorgon project, located off the northwest coast of Western Australia, t

about 13 years ago
USA: Commission Approves USD 1 Billion Port of Long Beach Budget
Business & Finance

USA: Commission Approves USD 1 Billion Port of Long Beach Budget

The Long Beach Board of Harbor Commissioners has approved a $1.02 billion budget for fiscal year 2014 that includes the Port of Long Beach’s largest-ever capital improvement spending plan. A total of $788 million in capital spending is 6 percent more than last year and leads the planned expenses in

about 13 years ago
STATS Group Ends TAQA’s Brent Pipeline Isolation Project (UK)
Business & Finance

STATS Group Ends TAQA’s Brent Pipeline Isolation Project (UK)

STATS Group has successfully completed an isolation project on TAQA’s Brent pipeline at Sullom Voe terminal in the Shetland Islands. BP required to undertake a valve refurbishment operation on the 36” Brent Pipeline Pig Receiver while the pipeline remained in normal operation. Aberdeen-based special

about 13 years ago
FPSO P-63 Leaves Rio Grande Shipyard, Brazil
Business & Finance

FPSO P-63 Leaves Rio Grande Shipyard, Brazil

The FPSO P-63 left the Quip/Honório Bicalho shipyard in the city of Rio Grande (RS) on Tuesday (18/06) after the modules were integrated and the platform was commissioned. The P-63 is one of the new units coming on stream in 2013 helping to increase oil production for Petrobras to reach the producti

about 13 years ago

Advertisement

Dockwise Delivers Spar Hull to Lucius O&G Project (USA)
Business & Finance

Dockwise Delivers Spar Hull to Lucius O&G Project (USA)

Boskalis announces that Dockwise safely and successfully offloaded the 23,000 ton Lucius spar last week for the Lucius deepwater oil and natural gas project located in the Gulf of Mexico. The Lucius truss spar, measuring 184 meters (605 feet) long and 34 meters (110 feet) in diameter, was loaded ont

about 13 years ago
USA: Corps to Invite Bids for Wells Harbor Dredging
Business & Finance

USA: Corps to Invite Bids for Wells Harbor Dredging

The U.S. Army Corps of Engineers, New England District, plans to issue an invitation for bids for maintenance dredging of the Wells Harbor Federal Navigation Project, and maintenance dredging by the Town of Wells. The proposed work consists of maintenance dredging of the 8-foot entrance channel, 6-f

about 13 years ago
Subsea 7 Orders DLS for Gorgon Project (Australia)
Business & Finance

Subsea 7 Orders DLS for Gorgon Project (Australia)

Handling systems specialist, Caley Ocean Systems has been awarded a contract by Subsea 7 to design, manufacture and supply a deepwater lowering system (DLS). The DLS will initially be deployed by Subsea 7 on the Chevron-operated Gorgon project, located off the northwest coast of Western Australia, t

about 13 years ago
Port of Bellingham to Advance Cleanup Project (USA)
Business & Finance

Port of Bellingham to Advance Cleanup Project (USA)

The Port of Bellingham is proposing to divide the 74-acre Georgia Pacific West cleanup site on the Bellingham waterfront into two separate cleanup areas, so the northern half of the site can be cleaned, opened to the community and redeveloped sooner. An in-depth environmental investigation shows tha

about 13 years ago