Business & Finance
Island Vanguard Undergoes Maintenance Work at Ulstein Verft, Norway
The Aker Yards-built vessel Island Vanguard, has had various maintenance work done at Ulstein Verft during the last week. “We are always keen to take on after market missions, and we are well equipped to take on most of this type of work on ships,” says service manager Håkon Langeland. “Ulstein Verf
UK: Centrica Energy Extends Contract for Freyja Viking
Centrica Energy has extended an existing contract for one year firm with a further one year option. Operating vessel is the Freyja Viking, a platform supply vessel of the VS470 MkII Design, operated by Viking Supply Ships. The extension is done on market conditions. Freyja Viking a VS470 Mk II desig
PSV Freyja Viking Gets Contract Extension from Centrica Energy (UK)
Centrica Energy has extended an existing contract for one year firm with a further one year option. Operating vessel is the Freyja Viking, a platform supply vessel of the VS470 MkII Design, operated by Viking Supply Ships. The extension is done on market conditions. Rederi AB TransAtlantic is a lead
Greece: Tsakos Energy Extends Charter for Suezmax Tanker ‘Arctic’
Tsakos Energy Navigation Limited yesterday announced a three-year time charter extension for the 2007 built, 163,216 dwt, double hull suezmax tanker, Arctic, with the same charterer, a South American state oil company. The charter incorporates minimum and maximum levels and a 50:50 profit split for
Norway: Eni to Carry Out Drilling with Scarabeo 8 on Goliat Field
Eni Norge AS has received consent to carry out drilling with the Scarabeo 8 mobile drilling facility. The consent relates to the drilling of appraisal well 7122/7 – Goliat, which is part of production licence 229 in Norwegian Barents sea. Water depth at the site is 382 metres. The operation has an e
Tidal Energy More Tangible for Territory, Australia
Power and Water has signed a Memorandum of Understanding with Tenax Energy to build a 2MW tidal energy plant and tidal energy testing centre. The move brings a tropical tidal energy supply for the Top End a step closer. Power and Water’s Manager Sustainable Energy Trevor Horman said Power and Water
Australia: Apache to Use AGR’s RMR on Coniston Development
Apache Energy Ltd has signed up to use AGR’s Riserless Mud Recovery (RMR®) system. Apache will use the RMR® solution for the first time during batch drilling of six top holes on its Coniston Development, offshore Western Australia, pending receipt of all necessary Government and other approvals for
Coastal Announces Initial Flow Rate from Songkhla A-10 Well in Gulf of Thailand
Coastal Energy Company announces the initial flow rate from the Songkhla A-10 well. The Songkhla A-10 well was completed using an electric submersible pump and is initially flowing approximately 4,000 bopd while still cleaning up. The next well, the A-13, has been spudded and will test the northeast
Norway: Ulstein Verft Conducts Maintenance Work on ‘Island Vanguard’
The Aker Yards-built vessel Island Vanguard, has had various maintenance work done at Ulstein Verft during the last week. “We are always keen to take on after market missions, and we are well equipped to take on most of this type of work on ships,” says service manager Håkon Langeland. “Ulstein Verf
Cyprus: SeaBird’s Hawk Explorer Gets Contract Extension
SeaBird Exploration Plc (“SeaBird) SeaBird announced that the Hawk Explorer has been extended by Spectrum ASA for a minimum of 2 months and will work under the new Framework Agreement. SeaBird is a global provider of marine acquisition for 2D/3D and 4D seismic data, and associated products and servi
Cyprus: SeaBird Announces Contract Extension for ‘Hawk Explorer’
SeaBird Exploration Plc (“SeaBird) SeaBird announced that the contract for Hawk Explorer has been extended by Spectrum ASA for a minimum of 2 months and will work under the new Framework Agreement. SeaBird is a global provider of marine acquisition for 2D/3D and 4D seismic data, and associated produ
Malaysia: Petronas Selects GE’s Compressor Technology for Its FLNG Project
GE Oil & Gas announced that it will supply its gas turbine-driven compressor train technology to Malaysia’s national oil and gas company Petronas for a floating liquefied natural gas (FLNG) facility that is being developed off the coast of Malaysia. The start-up of the FLNG facility is scheduled for
Iran: Gas Production in South Pars Gas Field Phases 17 &18 Starts This Winter
Gas production will start in South Pars gas field phases 17 and 18 this winter, an official said, adding that the gas will then be injected to the national gas grid after treatment at gas processing plants of phases 15 and 16 in Assalouyeh, the onshore installations of the South Pars gas field. Mana
Singapore Based Ezion Holdings Secures Two Service Rig Contracts
The Board of Directors of Ezion Holdings Limited announced that it has secured a charter contract and a letter of intent to provide two Service Rigs to be used by a Southeast Asian based national oil company to support its oil & gas activities. The charter contract with a value of approximately USD