
Equinor has anchored its new floating production, storage, and offloading (FPSO) vessel to the seabed with mooring lines and will proceed to complete the rest of the items on the production start-up list to bring its oil project in the Barents Sea online, enabling the FPSO unit to embark on a three-

As part of a contract with Norway’s technology company ECOnnect Energy, French Geocean has picked up the thermo composite pipes (TCP) reels that will connect the FSRU to the onshore site as part of the second liquefied natural gas (LNG) terminal in Wilhelmshaven developed by German state-owned Deuts