
Oil and gas company Neptune Energy has started drilling the Calypso exploration well located in the Norwegian Sea.

Subsea 7 has entered into a long-term deal with Pipeline Technique (PTL) for the provision of welding and coating services.

After Greenpeace said that TotalEnergies’ emissions are four times higher than reported, the oil major has decided to pursue legal action.

Trillion has started the work planned for the second well in its 2022 – 2023 drilling campaign on a gas field in the Black Sea off Türkiye.

Transocean is expecting the demand for its rigs to remain high, leading to a further improvement in day rates and fleet utilisation.

UK’s Unite the union has served a notice of action on Petrofac as part of an ongoing contract dispute with workers on Repsol’s assets.

Norway’s Equinor and UK’s Centrica have signed a cooperation agreement to explore the development of a low-carbon hydrogen production hub at Easington in East Yorkshire, with the aim to strengthen the region’s status as the UK’s foremost hydrogen place. Under the agreement, the Centrica-operated are

After completing a sidetrack well and a DST, OMV will work with its partners to evaluate a gas-condensate discovery in the North Sea

Germany’s Wintershall Dea has completed the sale of its interest in three North Sea fields to Norway’s OKEA.

Shell has added a gas field located West of Shetland to its asset portfolio thanks to a deal with Reabold Resources.

Trillion has revealed flow test results for the first well in its 2022 – 2023 drilling campaign on a gas field in the Black Sea off Türkiye.

UK’s regulator says that the industry will make significant savings in time and money following its move to cut red tape and scrap the requirement for CoP reports.

Amon Maritime has launched a new offshore market player – Amon Offshore – and a carbon-free, ammonia-powered PSV design.

The receiving terminal of the Baltic Pipe project located at Varde in Western Jutland, Denmark, has been put into operation and is now receiving gas from Norway. The terminal was put into operation on 1 November at 6 a.m. local time, so far with half of the total capacity (6,700 MWh/h). This means t