
Transmission system operator 50Hertz has announced that the Arcadis Ost 1 offshore substation has been connected to the German extra-high voltage grid after the 220 kV submarine cable required for this was pulled into place on the platform over the past few days. Final assembly and commissioning wor

Korean shipyard Hyundai Samho Heavy Industries (HSHI) has ordered the tank design for two new LNG carriers from French LNG containment specialist GTT.