Advertisement

Low-Carbon Transition

FLNG MKII design with 3.5 mtpa; Source: Golar LNG
Low-Carbon Transition

New order fires starting gun on next LNG-carrier-to-FLNG conversion work with $2.2 billion budget

Golar LNG is pooling resources with China’s CIMC Raffles and Black & Veatch to bring to life an MK II floating LNG (FLNG) vessel with an annual liquefaction capacity of 3.5 million tons of LNG per annum (mtpa).

about 2 years ago
FSRU Excelsior; Source: Excelerate Energy
Low-Carbon Transition

European firm sets up shop in Germany to handle work on Wilhelmshaven 2 LNG terminal

KN Energies (KN) has hung out its shingle in Germany by establishing a German subsidiary, KN Energies Deutschland, within its corporate group, which will be in charge of executing its assignment with the German state-owned company, Deutsche Energy Terminal (DET), by providing technical operation and

about 2 years ago
FSRU Alexandroupolis; Source: Gastrade
Low-Carbon Transition

Countdown to commercial ops at European LNG terminal underway

Greece’s first offshore liquefied natural gas (LNG) terminal, which is expected to secure low-emission energy while enhancing Southeastern Europe’s diversification of gas sources, is fast approaching its commercial operations date, with less than two weeks left until start-up.

about 2 years ago
Illustration; Source: Offshore Energies UK (OEUK)
Low-Carbon Transition

UK’s oil & gas industry on its way to surpassing methane and production emissions cuts years before deadline

The UK wants decarbonized oil and gas production to power its homes and businesses with low-carbon and zero-emission energy.

about 2 years ago
Norbe VIII drillship; Source: Foresea
Low-Carbon Transition

WATCH: Foresea rig comes to Brazilian shipyard ahead of its drilling gig with Petrobras

Foresea has sent one of its drillships to undertake a 15-year special periodic survey (SPS) at the Rio Grande Shipyard, where the rig will get ready for its new assignment off the coast of Brazil, which is slated to begin next quarter with the state-owned energy giant Petrobras.

about 2 years ago

Advertisement

North Field; Source: QatarEnergy LNG
Low-Carbon Transition

Saipem scoops up $4 billion for work on mega natural gas field offshore Qatar

Saipem has won a multibillion-dollar deal for an offshore project designed to help maintain natural gas production from the biggest field off the northern coast of Qatar.

about 2 years ago
Browse to North-West Shelf project development concept; Source: Woodside
Low-Carbon Transition

$30 billion offshore energy undertaking at stake of being thwarted as endangered sea snake slithers to mega gas project

Will a dusky sea snake, which has been put on the endangered list by the Australian federal government, jeopardize a project, led by Australia’s energy giant Woodside and valued at over $30 billion, to develop what is said to be the country’s largest untapped conventional gas resource?

14 minutes read
Illustration; Source: BV
Low-Carbon Transition

Closing ‘reality gap’ between net zero ambition and energy transition action requires US and EU to pull all decarbonization levers

McKinsey & Company, a global management consulting firm, highlights the need to up the climate action ante by scaling up interrelated low-emission and green technologies.

about 2 years ago
Zama graphic; Credit: Wintershall Dea
Low-Carbon Transition

Mexico’s top oil & gas projects under development: Coming to grips with main hydrocarbon challenges and obstacles at home and abroad

Mexico’s energy officials have offered a glimpse into the prospects for the exploration and extraction of hydrocarbons not only in the domestic playground but also the international one, under the backdrop of economic, geopolitical, and energy transition woes and opportunities.

about 2 years ago
Rendering of Scarborough FPU; Source: Woodside
Low-Carbon Transition

Woodside eyes FPU subsea infrastructure work next year for giant Australian gas project

Woodside has handed out an environment plan (EP) to the country’s offshore regulator for a floating production unit (FPU) work associated with subsea infrastructure activities, including the Commonwealth waters portion of an export trunkline at a natural gas project off the coast of Australia.

about 2 years ago

Advertisement

Crown LNG plans to utilize gravity-based structures for LNG regasification and liquefaction facilities; Source: Crown LNG
Low-Carbon Transition

Crown on the lookout for new LNG opportunities but postpones sanctioning of FSRU project in UK

Crown LNG has bumped to next year the final investment decision (FID) for its planned and fully owned floating liquefied natural gas (FLNG) import terminal in Scotland’s Firth of Forth.

about 2 years ago
LNG carrier; Source: ABB
Low-Carbon Transition

Swiss firm to kit out QatarEnergy’s 15 LNG vessels with permanent magnet shaft generator tech

ABB has been tasked with providing permanent magnet shaft generator technology to power 15 liquified natural gas (LNG) carriers, which South Korea’s Samsung Heavy Industries (SHI) will build for work with QatarEnergy.

about 2 years ago
Rio Grande LNG
Low-Carbon Transition

$18.4 billion gas project’s life on the line – Court ruling poses a threat to US LNG infrastructure buildout, developer says

A court ruling is said to have put a liquefied natural gas (LNG) export project at Texas’ Port of Brownsville in danger by revoking the reauthorization granted by the Federal Energy Regulatory Commission (FERC).

about 2 years ago
Troll C platform in the North Sea; Source: Equinor
Low-Carbon Transition

Two North Sea platforms plug into shore power as works on full electrification continue to take decarbonization up a notch

Equinor has shifted its carbon footprint reduction efforts into higher gear with the partial electrification of two offshore platforms at a giant North Sea field off the coast of Norway.

about 2 years ago