Advertisement

Low-Carbon Transition

Illustration; Source: CNOOC
Low-Carbon Transition

China fires up first offshore oilfield running on shore power

CNOOC has boosted its low-carbon efforts by bringing online the first oilfield in the South China Sea, which is receiving power from shore.

about 2 years ago
Northern Lights carbon storage and transport project in Norway (for illustration purposes); Source: Equinor
Low-Carbon Transition

EU’s exit from embattled fossil fuel-loving treaty in the home stretch: New dawn breaking over 20-year sunset clause

The final push toward withdrawal the EU has taken to severe its Energy Charter Treaty (ECT) ties in a year is perceived as the right path to unleashing its green agenda.

about 2 years ago
Illustration; Source: Westwood
Low-Carbon Transition

Embracing key tools to navigate overlapping oil & gas, offshore wind, and carbon storage areas

Co-location conflicts between oil and gas projects, offshore wind farm developments, and carbon capture and storage (CCS) undertakings have emerged as an issue in the United Kingdom (UK).

about 2 years ago
Port Arthur LNG Phase 2; Source: Sempra
Low-Carbon Transition

Aramco ups gas game with US project in hot pursuit of shoo-in to global LNG club’s kingpins

Aramco is working with Sempra to get equity and offtake from a planned natural gas liquefaction and export terminal expansion project in Southeast Texas.

about 2 years ago
Venture Gator LNG carrier; Source: Venture Global LNG
Low-Carbon Transition

First of nine ships built to haul US LNG around the globe hits the water while light turns green for Venture Global’s third export facility

Venture Global has launched the first of nine LNG carriers that form part of its fleet designed to transport LNG.

about 2 years ago

Advertisement

Cedar LNG artist's rendering - View looking south from above Douglas Channel towards the proposed facility and docked LNG carrier; Source: Cedar LNG
Low-Carbon Transition

Canada’s $4 billion hydro-powered floating LNG project is a go

A final investment decision (FID) has been made for a floating liquefied natural gas (LNG) (FLNG) facility with a nameplate capacity of 3.3 million tonnes per annum (mtpa) on Canada’s West Coast.

about 2 years ago
Rendering of Commonwealth LNG; Source: Commonwealth LNG
Low-Carbon Transition

Louisiana’s LNG export terminal changing hands but FID still on track for next year

Kimmeridge has got its hands on the biggest slice of a proposed LNG export terminal project near Cameron, Louisiana.

about 2 years ago
Congo FLNG; Source: Eni
Low-Carbon Transition

Construction of second Congo-bound FLNG progressing on course for start-up next year, Eni says

Eni has confirmed that the building works related to a new 2.4 million tonnes per year (mtpa) FLNG unit are moving forward in line with its timeline.

about 2 years ago
1.2 mtpa FLNG; Source: Wison New Energies
Low-Carbon Transition

$1 billion deal for world’s ninth and Indonesia’s first FLNG goes to Wison New Energies

Genting has handed out a $1 billion contract to Wison New Energies to construct a floating liquefied natural gas (FLNG) facility.

about 2 years ago
Tchendo 2 MOPU; Source: Perenco
Low-Carbon Transition

Rig repurposed into MOPU with three gas turbines starts its new lease on life in Africa

Perenco has turned the power production switch on at its new mobile offshore production unit (MOPU) offshore Congo, Africa.

about 2 years ago

Advertisement

Illustration; Source: Norwegian Ministry of Energy
Low-Carbon Transition

Oil & gas players get their hands on CO2 storage licenses in North Sea

Three companies have confirmed the award of new CO2 storage licenses as part of the sixth call launched by Norway’s Ministry of Energy.

about 2 years ago
N05-A platform designed to be powered by offshore wind; Source: ONE-Dyas
Low-Carbon Transition

Court rules coast is clear for North Sea gas project: Will it be smooth sailing from here on?

Has a natural gas development in the North Sea finally managed to catch a break with calm seas and fair winds ahead or is this wishful thinking given the hard stance climate activities have taken on the project?

about 2 years ago
Pioneering Spirit (for illustration purposes); Source: Allseas
Low-Carbon Transition

Activists’ game plan for deep sea mining ban turns up the heat on Allseas to cease its pursuits

Allseas has been urged to abandon further technological development of giant mining machines due to the allegedly harmful consequences their use will have.

about 2 years ago
Sangomar field development; Source: Woodside Energy
Low-Carbon Transition

Woodside gives its management a facelift to take advantage of energy transition opportunities

Woodside has unveiled a revised leadership structure to streamline the delivery of the next phase of its energy transition strategy.

about 2 years ago