
The hull of NKT’s new cable-laying vessel (CLV) NKT Eleonora has been launched into the water at Vard’s shipyard in Tulcea, Romania. The official keel laying for the vessel took place in January 2025, some two months after the first steel was cut. NKT Eleonora will be able to run on both methanol an

Japanese shipping major Mitsui O.S.K. Lines (MOL) is acquiring a stake in Hamburg-based Deutsche Offshore Schifffahrt (DO), a joint venture with Schoeller Holdings, as well as shares in construction commissioning service operation vessels (C-CSOVs) currently under construction. The joint venture bet