
Major systems have been installed, powered and progressively brought online on board Nexans’ new cable-laying vessel (CLV) Nexans Electra, the French cable systems designer and manufacturer reported. Based on the ST-297 CLV design by Skipsteknisk, Nexans Electra, ordered as the second vessel by Nexa

Switzerland-based StreamTec Solutions has joined Worley in the execution team for an offshore pipeline that will connect green hydrogen obtained in the North Sea with the European mainland and onshore hydrogen infrastructure. The gigawatt-scale AquaDuctus hydrogen pipeline to be located in the Germa