
Dogger Bank Wind Farm has signed a contract with Jan De Nul Group for the transport and installation of GE Haliade-X offshore wind turbines at Dogger Bank A and Dogger Bank B. The installation of the 12 MW units at the site some 130 kilometres off the Yorkshire coast will start in 2023. Turbine tran

Sixteen out of 58 Siemens Gamesa 8.4 MW turbines have been installed at the SeaMade offshore wind project in Belgium. According to Otary CEO Mathias Verkest, the 9th turbine load-out is currently being prepared at the Port of Oostende. DEME’s Apollo installed the first turbine at the project site lo