Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Offshore Wind

Loading filters...
GridWind FarmsProject & TendersPorts & LogisticsVesselsBusiness Developments & ProjectsTurbinesResearch & DevelopmentCertification & ClassificationSubseaOil & GasAuthorities & GovernmentSurveys & InterventionsRules & RegulationFoundationsTechnologyEquipmentClean FuelDredgingFossil EnergyGreen MarineMarine EnergyCollaborationEnvironmentTransition
Van-Oord-Taps-Visser-Smit-Hanab-for-Borssele-III-and-IV-Cables
Offshore Wind

Van Oord taps Visser & Smit Hanab for Borssele III and IV cables

Van Oord has awarded Dutch high voltage specialists Visser & Smit Hanab with a contract to perform all array cable terminations and testing work at the Borssele III and IV offshore wind farm in the Dutch North Sea. A total of 77 MHI Vestas V164 9.5 MW wind turbines will be connected to the Borssele

about 6 years ago
TenneT Picks SeaRenergy for Offshore Cargo Runs
Offshore Wind

TenneT picks SeaRenergy for offshore cargo runs

Transmission system operator TenneT has selected SeaRenergy Offshore Holding GmbH to provide a DP2-compliant Platform Supply Vessel (PSV) for the supply runs of cargo to the offshore platforms in the German and Dutch North Sea. Under the contract, SeaRenergy will continuously provide and operate an

about 6 years ago
Elia-and-50Hertz-Looking-for-UXO-Consultancy
Offshore Wind

Elia and 50Hertz looking for UXO consultancy

Elia and 50Hertz Transmission have issued a tender seeking a UXO expert for offshore platforms in Belgium and Germany. In Phase 1, the contractor will provide a desktop study and a presentation of results on a UXO risk workshop with the client. The selected party will then in phase two provide consu

about 6 years ago
Sea Challenger Loading First Borssele 1+2 Turbine Components in Esbjerg
Offshore Wind

Sea Challenger loading first Borssele 1+2 turbine components in Esbjerg

DEME Group’s installation vessel Sea Challenger has started loading the first wind turbine components for the Borssele 1 + 2 offshore wind farm at the Port of Esbjerg in Denmark. Located some 23 kilometres off the coast of Zeeland in the Netherlands, the 752 MW Borssele 1 + 2 wind farm will feature

about 6 years ago
ACT’s-Lightweight-Blade-Passes-First-Test
Offshore Wind

ACT’s lightweight turbine blade passes first test

ACT Blade, a spin-off company from UK yacht-sail developer SMAR Azure, has completed the first test of its new lightweight blade for wind farms at ORE Catapult’s Blade Test Facility in Blyth. This first of two static tests was carried out in three weeks and saw a full-length 13m blade withstand the

about 6 years ago
Elia-and-50Hertz-Seeking-Certification-Body-for-Offshore-Platforms
Offshore Wind

Elia and 50Hertz seeking certification body for offshore platforms

Elia and 50Hertz have issued a tender looking for a certification body for offshore platforms in Belgium and Germany. The contractor will be in charge of seabed survey certification for platform locations, conceptual and basic design certification, and detailed design substructures certification bas

about 6 years ago
Oceaneering in seabed clearance deal for Moray East wind farm
Offshore Wind

Oceaneering in seabed clearance deal for Moray East wind farm

Oceaneering International Services (OISL) has got a contract to complete seabed route and debris clearance for the Moray East wind farm project in the Moray Firth, Scotland.

about 6 years ago
An image showing positions of the oil and gas platforms and the Hywind Tampen floating wind farm
Offshore Wind

Norwegian authorities give go-ahead to Hywind Tampen

Norwegian Ministry of Petroleum and Industry has approved the plans for development and operation of the Hywind Tampen project, which will make the Snorre and Gullfaks platforms the world’s first oil & gas platforms to be powered by a floating offshore wind farm.

about 6 years ago
A photo of ordnance exploding at sea as part of UXO clearing project
Offshore Wind

Offshore wind gets first guidance for UXO and boulders geophysical surveying

The Carbon Trust’s Offshore Wind Accelerator (OWA) has published guidance for the geophysical surveying for unexploded ordnance (UXO) and boulders.

about 6 years ago
Slip joint transition piece
Offshore Wind

Sif displays slip joint hardware

Dutch offshore foundations manufacturer Sif has upended the slip joint transition piece built for the Borssele V innovation site at its facility on Maasvlakte 2 in the Port of Rotterdam. The slip joint monopile is in the company’s storage area at Maasvlakte 2. The slip joint monopile foundation will

about 6 years ago
A photo of a vessel at sea installing Riffgat monopiles with vibro tool
Offshore Wind

Kaskasi monopiles to be hammered in with CAPE Holland’s vibro tool

Seaway 7 has signed a contract with CAPE Holland for the supply of Vibro Lifting Tool for the installation of monopiles at the Kaskasi offshore wind farm.

about 6 years ago
He Dreiht turbine foundation designer wanted
Offshore Wind

He Dreiht turbine foundation designer wanted

EnBW He Dreiht GmbH has issued a tender seeking the detailed design of the substructures and foundations of wind turbines for the 900 MW EnBW He Dreiht offshore wind project in the German North Sea. The contract scope covers the structural design of jacket and monopile foundations, electrical and me

about 6 years ago
Borssele Beta offshore substation topside touches down
Offshore Wind

Borssele Beta offshore substation topside touches down

The Borssele Beta offshore substation topside has been installed at the project site in the Dutch North Sea. The topside sailed out from HSM Offshore’s yard in Schiedam at the end of March to the site but was awaiting favorable weather conditions to be installed. Borssele Beta will connect the 731.5

about 6 years ago
Offshore Energy platform: connecting the gears
Offshore Wind

Offshore Energy platform: connecting the gears

Change is the only constant. This was as true for the ancient Greek who coined the phrase, as it is for us today. Our industry is changing. The need to innovate and transform are key in remaining relevant and future-proof. This is why we present the Offshore Energy platform. It combines all the elem

about 6 years ago
  • 1
  • …
  • 272
  • 273
  • 274
  • …
  • 1573