
Irish developer of hydrokinetic solutions GKinetic Energy has delivered its optimised 12kW hydrokinetic device to Strangford Lough, where it will be deployed in combination with energy storage unit.

The North Sea Link (NSL) interconnector between Norway and the UK will operate at reduced capacity until mid-February 2022 following a fault detected in one of its converters, Norwegian system operator Statnett reported.