
Nexans has completed the manufacturing and factory acceptance testing (FAT) of 100 kilometers of subsea cable for the second electrical interconnector between Malta and Italy, with the cable now ready for load-out and installation. The IC2 interconnector will consist of a new 122-kilometer-long, 225

Norwegian ship designer and shipbuilder VARD has delivered a 151-meter-long hybrid construction and cable laying vessel (CLV) to Japanese Toyo Construction, destined for Japan’s offshore wind market. The vessel, named Discovery, was delivered on June 26 from Vard Langsten in Norway, where it was out