Advertisement

Project & Tenders

Update on the Napa River Dredging Project
Project & Tenders

Update on the Napa River Dredging Project

The official kickoff of the Napa River dredging project is expected in mid-September. According to a spokesman from the U.S. Army Corps of Engineers, the dredging scheme has been scheduled for mid-September and will last through November. The dredging will remove around 300,000 cubic yards of sedime

about 10 years ago
Laing O’Rourke wins $200 mln Ichthys LNG job
Project & Tenders

Laing O’Rourke wins $200 mln Ichthys LNG job

LNG engineer Laing O’Rourke said it won another contact with JKC for the Inpex-operated Ichthys LNG project’s onshore facilities in Darwin, valued at US$200 million.

about 10 years ago
MAN D&T engines ordered for LNG-powered bulk carrier
Project & Tenders

MAN D&T engines ordered for LNG-powered bulk carrier

MAN Diesel & Turbo said it has received an order to supply its ME-GI dual fuel low-speed diesel engine for a 50,000 dwt bulk carrier South Korean shipowner Ilshin ordered at Hyundai Mipo Dockyard.

about 10 years ago
Petrobras brings online FPSO Cidade de Saquarema
Project & Tenders

Petrobras brings online FPSO Cidade de Saquarema

Brazil’s state-owned oil giant Petrobras has started operations on the Lula field, located in the Santos Basin offshore Brazil, by connecting the first production well to the FPSO Cidade de Saquarema. The production well was connected on Friday, July 8, and the output was stabilized to around 30 mil

about 10 years ago
Jee in Cable Optimisation Study for East Anglia ONE
Project & Tenders

Jee in Cable Optimisation Study for East Anglia ONE

Jee has been awarded a contract by Scottish Power Renewables to carry out an array cable optimisation study for the East Anglia ONE (EAONE) offshore wind farm. EAONE is a development planned off the coast of East Anglia for 102 turbines; enough to power more than 50,000 homes every year. Scottish Po

about 10 years ago

Advertisement

Searcher Seismic starts processing Olympus 3D (Australia)
Project & Tenders

Searcher Seismic starts processing Olympus 3D (Australia)

Searcher Seismic has informed that the Olympus 3D reprocessing project in the Carnarvon Basin, Western Australia, has started processing at DownUnder GeoSolutions’ Perth facility. The project, in cooperation with Spectrum, comprises the reprocessing of 20 existing 3D datasets through a broadband pre

about 10 years ago
UTEC completes deepwater positioning project in Gulf of Mexico
Project & Tenders

UTEC completes deepwater positioning project in Gulf of Mexico

UTEC Survey, an independent offshore and onshore survey provider, has completed an ROV navigation and seismic node deepwater positioning project in the Gulf of Mexico. UTEC said the project was carried out for FairfieldNodal in 2425m of water using the latest software and navigation technologies. Th

about 10 years ago
Project of the Year Award for Balfour Beatty
Project & Tenders

Project of the Year Award for Balfour Beatty

Balfour Beatty has been awarded Project of the Year with a Geotechnical Value of over £3 million at the Ground Engineering Awards 2016. The award recognizes the work undertaken to stabilize a historic landslide in Lyme Regis and the efforts made to ensure the work did not impact on the area’s UNESCO

about 10 years ago
Dril-Quip Bags $40 Mln Indonesia Contract
Project & Tenders

Dril-Quip Bags $40 Mln Indonesia Contract

Dril-Quip Asia Pacific, in conjunction with its local representative, has been awarded a contract to supply subsea drilling and production equipment and related services to Kangean Energy Indonesia. Kangean Energy is a contractor for SKK Migas, for the development of its Terang/Sirasun/Batur gas fie

about 10 years ago
Port of Tauranga Ready for Big Ships
Project & Tenders

Port of Tauranga Ready for Big Ships

Maersk Line and Kotahi are set to welcome the largest container ship to ever visit New Zealand waters calling at Port of Tauranga at the start of the peak export season. According to Kotahi Chief Executive David Ross, the new era of big ship visits to New Zealand has been made possible through Kotah

about 10 years ago

Advertisement

Premier ramping up Solan production. First oil from Catcher still on track
Project & Tenders

Premier ramping up Solan production. First oil from Catcher still on track

Independent oil and gas company Premier Oil is ramping up oil production at its Solan field, in the UK North Sea, to 14 kbopd from the first production well, currently at 11 kbopd. First oil from the Solan field was achieved on April 12. Premier subsequently carried out a planned production shut dow

about 10 years ago
Senvion Charters CSV Polar Queen from GC Rieber
Project & Tenders

Senvion Charters CSV Polar Queen from GC Rieber

GC Rieber Shipping has entered into a time charter agreement with Senvion GmbH for the construction support vessel (CSV) Polar Queen. The contract is for a fixed period of seven months with options to extend by up to three months. The charter will start in spring 2017, the company informed. CSV Pola

about 10 years ago
Aker Solutions Scores Vietnam FEED Deal with Idemitsu
Project & Tenders

Aker Solutions Scores Vietnam FEED Deal with Idemitsu

Aker Solutions has secured a contract from Idemitsu Oil and Gas to provide engineering services for the development of oil and gas resources in the Nam Con Son basin offshore Vietnam. It is the first time Aker Solutions teams up with Idemitsu on a project in Asia Pacific and marks an expansion into

about 10 years ago
AusGroup wins Prelude FLNG job
Project & Tenders

AusGroup wins Prelude FLNG job

AusGroup on Tuesday said its unit MAS Australasia reached an agreement with Technip Oceania for the supply of scaffolding and rope access services on the Shell-operated Prelude FLNG project.

about 10 years ago