Advertisement

Project & Tenders

An offshore wind farm in sunset
Project & Tenders

Ordtek to develop UXO strategy for Baltica 2, Baltica 3 offshore wind farms

PGE Baltica and Ordtek have signed a contract to prepare a strategy that will define the methodology of dealing with the potential risk related to the presence of unexploded ordnance (UXO) at the Baltica 2 and Baltica 3 offshore wind project sites. In preparation for the construction of PGE’s offsho

about 6 years ago
Offshore wind turbines
Project & Tenders

Saint-Brieuc OWF cleared of all appeals in France

The Saint-Brieuc offshore wind project is now free from any appeals before the French courts, according to an update from Ailes Marines on 3 December. The appeal had been filed by the Association for the Protection of the Sites of Erquy and Surrounding Sites (ASPE), Erquy Environnement and others, r

about 6 years ago
Sangomar project - Woodside
Project & Tenders

Woodside prevents FAR’s Sangomar deal with ONGC

Woodside has exercised its right to pre-empt the sale by FAR to ONGC Videsh of FAR’s entire participating interest in the RSSD joint venture in Senegal.

about 6 years ago
Atlantic Guardian vessel
Project & Tenders

EMGS wins Gulf of Mexico survey

EMGS has received a letter of award for 3D CSEM and magnetotelluric multi-client survey in the Gulf of Mexico. The letter of award comes from one of the EMGS’ existing clients and also represents the first project for this customer in the Gulf of Mexico. Norwegian geophysical services company expect

about 6 years ago
H-Energy finalizes Jaigarh FSRU deal with Höegh LNG
Project & Tenders

H-Energy finalizes Jaigarh FSRU deal with Höegh LNG

H-Energy has finalized the deal with Höegh LNG for the supply of an FSRU for the Jaigarh LNG project in the Ratnagiri district of Maharashtra, India.

about 6 years ago

Advertisement

Croatia's first FSRU arrives at Krk island
Project & Tenders

Croatia’s first FSRU arrives at Krk island

Croatia’s first floating storage and regasification unit (FSRU) LNG Croatia has reached the terminal site on the Island of Krk.

about 6 years ago
Transmission Coordination Road to UK's 2030 Offshore Wind Ambition
Project & Tenders

Transmission coordination road to UK’s 2030 offshore wind ambition

The increase of UK’s goal to have 40 GW instead of 30 GW of offshore wind by 2030 represents a huge opportunity for the sector. However, it is not without its challenges. With the quadrupling of capacity, cumulative environmental and social impacts of the lack of offshore transmission coordination r

about 6 years ago
Cliff Head platform; Source: Triangle Energy
Project & Tenders

Triangle Energy restarts production from Cliff Head well

Australia’s Triangle Energy has resumed production from the CH-7 well at the Cliff Head oil field following a successful workover program.

about 6 years ago
Valaris DS-12 drillship; Source: Valaris
Project & Tenders

BP starts drilling Platina field offshore Angola

Oil major BP has begun drilling on the Platina field in Block 18 offshore Angola using Valaris’ DS-12 drillship.

about 6 years ago
Pipeshield Bi-flex N2 Edge concrete mattresses
Project & Tenders

Pipeshield lands Oz contract with Subsea 7

Subsea 7 has contracted Tekmar’s Pipeshield to supply concrete mattresses for a project in the Bass Strait, Australia. The work scope for the project comprises the manufacturing and transportation of Bi-flex N2 Edge concrete mattresses to Australia where they will be used for scour protection around

about 6 years ago

Advertisement

An image rendering converter platform at an offshore wind farm
Project & Tenders

AEG bags Dogger Bank A & B contract with Aibel

Aibel has awarded AEG Power Solutions with a contract for the supply of its Protect 8 UPS and Protect RCS rectifiers to secure power on the HVDC offshore converter platforms for Dogger Bank A and Dogger Bank B. AEG PS will deliver two Protect RCS 110TPRE1200 rectifiers, two Protect 8 inverters 60KVA

about 6 years ago
BoldWind loading nacelles for Triton Knoll at LINDØ port of ODENSE
Project & Tenders

BoldWind picks up Triton Knoll nacelles in Odense

The MV BoldWind heavy load deck carrier has picked up the wind turbine nacelles for the Triton Knoll offshore wind farm at the LINDØ site in the Danish port of Odense. The vessel arrived there last week, according to LINDØ, which added that this was the first port call there for MV BoldWind. After l

about 6 years ago
GE-Haliade-X-for-First-Large-Scale-US-Offshore-Wind-Farm
Project & Tenders

GE Haliade-X for first large-scale US offshore wind farm

Vineyard Wind has selected GE Renewable Energy as the preferred turbine supplier for the first U.S. large-scale offshore wind project. Vineyard Wind 1 will feature the GE Haliade-X units, the most powerful offshore wind turbine in operation to date. As a part of reaching this milestone, the develope

about 6 years ago
Naturgy, Eni clear path for Damietta LNG restart
Project & Tenders

Naturgy, Eni clear path for Damietta LNG restart

Naturgy, Eni and Egypt have reached a new agreement to resolve the disputes affecting Unión Fenosa Gas (UFG), a 50/50 joint venture between Naturgy and ENI.

about 6 years ago