
Offshore drilling contractor Stena Drilling has ordered a fourth managed pressure drilling (MPD) system for the Stena Forth drillship.

Offshore geoscience and geotechnical engineering consultancy Cathie has carried out a foundation design feasibility study for an offshore, subsea datacenter. Cathie’s undisclosed system developer for the storage of datacenters offshore and underwater, engaged them to undertake a foundation design st