Minesto has resumed testing of its commercial-scale DG500 kite system at the company’s Holyhead Deep site off North Wales. “We are very pleased to be back in the water with the DG500 kite system, and we are looking forward to the continued testing operations. The team has made a great effort in upgr
A new project, funded by Ocean Energy Era-Net Cofund, has been launched to support investment and growth in the wave and tidal energy sector through the creation of an integrated marine data toolbox. The RESOURCECODE project brings together the European Marine Energy Centre (EMEC), Ifremer, Ocean Da
A keel laying ceremony for a non-self-propelled cutter suction dredger (CSD) – Project 4395 – took place yesterday at PAO Shipbuilding-Ship Repair Corporation (Gorodets, Nizhny Novgorod region), reports press center of Federal Marine and River Transport Agency (Rosmorrechflot). The dredger will be b
The DEME’s new trailing suction hopper dredger (TSHD) ‘Bonny River’, built at Royal IHC’s Chinese partner yard COSCO Guangdong Shipyard, is propelled by SCHOTTEL, the German propulsion expert. Recently handed over to the Belgian dredging company DEME, the new TSHD is driven by controllable pitch pro
IRENA’s event “Unlocking the potential of ocean energy around the globe”, organised in partnership with the Ocean Energy Europe, will complement and continue the OEE2019 programme. The event features sessions with national and regional representatives from all corners of the globe and key experts in
Royal IHC has just released this very interesting behind-the-scenes video of the trailing suction hopper dredger (TSHD) 4,200m³ D11 – 21 DE JULIO. The TSHD was partially built in the Netherlands, before being completed in Montevideo, Uruguay, for the Administración Nacional de Puertos (ANP). The bas
Minesto has completed the test site infrastructure installations at the Holyhead Deep site off North Wales. After installing the upgraded infrastructure, the site is ready for installation and commissioning of Minesto’s DG500 kite system. After a period of maintenance and upgrade, the microgrid syst
GE Renewable Energy has sent off the nacelle of the Haliade-X 12MW offshore wind turbine from its production site in Saint-Nazaire, France, to Rotterdam, the Netherlands. The Haliade-X 12MW components will be assembled in Rotterdam-Maasvlakte, after which the turbine will be installed onshore to fac
GE Renewable Energy has sent off the nacelle of the Haliade-X 12MW offshore wind turbine from its production site in Saint-Nazaire, France, to Rotterdam, the Netherlands. The Haliade-X 12MW components will be assembled in Rotterdam-Maasvlakte, after which the turbine will be installed onshore to fac
Orbital Marine Power (Orbital) has awarded the main manufacturing contract for its first commercial O2 tidal stream turbine to Scottish based TEXO Group, who will carry out the work at their quayside facilities in Dundee. The multi-million-pound contract marks the start of major construction for the
Ocean Power Technologies, in partnership with the Acteon Group, has recently unveiled the PB3 PowerBuoy in Montrose – prior to its demonstration in the North Sea on Premier’s Huntington field. The project, supported by the OGTC and Premier Oil, is PB3 PowerBuoy’s first-of-its-kind deployment in the
The construction activities on the hydrographic research vessel Geo Ranger for Geo Plus B.V. are moving ahead according to plan, the Dutch Shipyard Royal Niestern Sander said in its latest announcement. Once operational, this vessel will be available to charter by parties conducting hydrographic sur
A christening ceremony of the 30-inch hydraulic cutter suction dredger (CSD) J.R. Chatry, the Weeks Marine’s newest member of its dredging fleet, took place earlier this week, the Louisiana Coastal Protection and Restoration Authority (CPRA) informs. The new $60 million dredger – the most highly aut
IMS Dredge, Division of Ellicott Dredge Technologies, has just released these beautiful photos of their IMS DM-60 Depth Master working in a reservoir in Guatemala. The DM-60 was chosen for its ability to create an even bottom profile in the dam instead of creating a moonscape in the bottom using a h