Vessels
LNG Tanker Scheduled at UK Dragon Terminal April 10
The LNG Ondo liquefied natural gas carrier, with a capacity of 148,478 cubic metres, is due to arrive in the UK’s Dragon terminal April 10, according to the Milford Haven Port Authority website. BG and Petronas between them have contracted for the full capacity at Dragon LNG’s Milford Haven site ove
China: Repair Works on Dredger Hu Men Completed
The large dredger “Hu Men” entered the CIC BLM Shipyard in late February, the main works included regular docking jobs, the repair of… (csgcic) [mappress] Source: csgcic, April 1, 2011;
Liquid Waste Technology Delivers and Installs Mud Cat Dredge in Chile
Liquid Waste Technology (LWT) has delivered and installed its new remote controlled diesel powered Mud Cat™ dredge to the Minera… (wastewaterpr) [mappress] Source: wastewaterpr, March 28, 2011
UK: Zarga to Arrive at South Hook LNG Terminal March 29
The Zarga LNG carrier, with a capacity of 266,000 cubic metres, is due to arrive in the UK’s South Hook terminal March 29, according to the Milford Haven Port Authority website. The South Hook terminal can process 15.6 million tonnes of LNG a year and is capable of delivering 21 billion cubic metres
Sierra Leone: Three Dredgers and Operating Equipment Arrive in Freetown
Sunergy, Inc today announces that the container with the 3 dredges and operating equipment has arrived in Freetown, Sierra Leone. This now sets the stage for operations to commence on the Company’s 140 sq. km. Pampana River Project once the shipment clears customs and is moved to the site. Company o
BLRT Grupp, Rohde Nielsen Ink Agreement for Dredger Construction
The largest shipbuilding company in the Baltic States which is a subsidiary of BLRT Grupp entered into the agreement with the Scandinavian company to build the new vessel for dredging of sea bed. The company Vakarų Baltijos laivų statykla signed an agreement with Danish company Rohde Nielsen to buil
Australia: Birdon Marine to Build USD 1.6 Million Dredger for the State Government
The state government has defended its decision to tender a dredging project to Port Macquarie based Birdon Marine. (abc) [mappress] Source: abc, March 17, 2011
Alto Group to Prepare Nessie N8DX CHD for Bogue River Dredging Project
Alto Group Holdings, Inc., an innovative mining and commodities trade company headquartered in New York, announces its newly purchased Nessie N8DX cutter head dredge is being transported for servicing to prepare for the anticipated production planned on Bogue River Dredge Concession in Mali, West Af
MAN Diesel & Turbo Designs LNG Engine for DNV Quantum 9000 (UK)
By introducing a new solution for LNG-fuelled ships, DNV and MAN Diesel & Turbo are taking the Quantum concept ship one stroke further. Both the machinery and the hull design and arrangement have been improved. A year ago, DNV launched its container ship concept – Quantum. This concept ship was desi
Australia: New Dredger for Swansea Channel to Boost Economic Development
The chair of the Lake Macquarie Aquatic Services Committee says having a new dredge for the Swansea Channel will give yachting clubs the certainty to stage regattas… (abc) [mappress] Source: abc, March 16, 2011;
Germany: SAL Schiffahrtskontor Altes Land Puts MV Lone into Service
She perfectly resembles her sister, is just as strong and can be positioned to maximum precision: SAL Schiffahrtskontor Altes Land puts the new building MV ‘Lone’ into service. Just three months after the German-based heavy-lift shipping company has sent the MV ‘Svenja’ – the world’s largest heavy-l
UK: South Hook LNG Terminal to Get Cargo March 18
The Al Mafyar LNG carrier, with a capacity of 266,000 cubic metres, is due to arrive in the UK’s South Hook terminal March 18, according to the Milford Haven Port Authority website. The South Hook terminal can process 15.6 million tonnes of LNG a year and is capable of delivering 21 billion cubic me
Sierra Leone: Dredging Equipment to Arrive in Freetown by March 15
Sunergy, Inc today announces that it has received notification from the shipping company that the ETA for the container with the 3 dredges and operating equipment is now scheduled to arrive in Freetown, Sierra Leone by next Tuesday, March 15, 2011. Severe winter weather conditions, both on land and
UK: Aberdeen Harbour Board Takes Delivery of New Workboat
Macduff Shipyards has just completed and delivered a new steel workboat to the Aberdeen Harbour Board, UK, which will be used for general… (bairdmaritime) [mappress] Source: bairdmaritime, March 8, 2011