
Poland’s Orlen Group has selected three local companies to explore the geological conditions of the seabed within the Baltic East offshore wind farm concession area in the Baltic Sea. A consortium of three companies, MEWO, Orlen Petrobaltic, and Geofizyka Toruń, will conduct geological engineering,

Preparation work for the installation of the Hornsea Three export cable is underway with boulder and debris relocation, and a geophysical survey starting this month, following the completion of UXO clearance work. An installation campaign to replace blanking plates from the horizontal directional dr

A tender has been launched seeking geophysical survey services for the Estonian-Latvian cross-border offshore wind project. The tender submission date is June 27, and the estimated duration for the ELWIND offshore wind project is from August 15, 2025, to March 31, 2027. The objective of the survey i

Fugro will carry out an offshore geotechnical survey at the Morgan and Mona offshore wind sites in the UK, starting on or around June 2. Using its geotechnical drilling vessel Fugro Synergy, the company will be drilling, sampling and coring boreholes throughout the array areas, with the works estima

Geoquip Marine has completed a preliminary geotechnical site investigation for two 4 GW offshore wind projects in the German North Sea. Under the contract, the UK-based company drilled 28 boreholes across the project sites to analyse the subsea terrain for wind turbine foundations. Geoquip underwent

PGE Baltica has signed a contract with a consortium of Polish companies to carry out a specialist geophysical survey of the Baltic Sea seabed for the Baltica 9 offshore wind farm. The two companies that will perform the survey of the Baltic Sea seabed for the presence of unexploded ordnance and shal

DEME Group has acquired a 50% stake in Germany-based Bauer Offshore Technology, which provides drilling services for the construction of offshore wind foundations. DEME Group’s wholly owned subsidiary DEME Offshore Holding acquired a stake in the Schobenhausen-based company. Bauer Offshore Technolog

Ørsted has completed geotechnical and geophysical investigations at two Gippsland offshore wind farm sites in Australia. Using specialist vessels and equipment, the developer tested approximately 60 locations across its two feasibility licence areas by scanning and sampling the seabed in the Bass St

The dynamic subsea power export cable for the HKN1 offshore solar project at the Hollandse Kust Noord (HKN) offshore wind farm, the first of its kind connected to an offshore wind grid, has been tested and delivered. Oceans of Energy and CrossWindHKN confirmed the completion of the factory acceptanc

RWE and Masdar have signed contracts with TGS and Fugro to conduct detailed geophysical and geotechnical surveys for the eastern array of the proposed Dogger Bank South (DBS) offshore wind farms. According to the developers, these site investigations will enhance understanding of the seabed conditio

South Korea-based LS Marine Solution has signed a contract, worth approximately $15.8 million (about €13.8 million), to lay submarine cables for the Taipower Offshore Wind Project Phase II (TPC Changhua Phase II) in Taiwan. According to the company, the contract marks LS Marine Solution’s first win

The Dutch company, N-Sea Group, has been awarded a contract to repair one of the four export cables that connect the 576 MW Gwynt y Môr offshore wind farm in the UK to the National Grid. N-Sea will be responsible for replacing a five-kilometer section of 132 kV export cable from the onshore transiti

Prysmian’s new cable laying vessel (CLV) Monna Lisa has been loaded for the first time with submarine cable, destined for what will become the largest U.S. offshore wind farm once operational. Prysmian reported two days ago that submarine cable for Dominion Energy’s Coastal Virginia Offshore Wind (C

Ørsted is conducting a confirmed unexploded ordnance (cUXO) removal campaign along the export cable route of the Hornsea Three offshore wind project in the UK and a potential UXO (pUXO) inspection campaign in the array area. As of April 14, 24 confirmed UXOs within the Hornsea Three export cable rou