Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Wind Farms

Loading filters...
Operations & MaintenanceTechnologyAuthorities & GovernmentBusiness & FinanceStorageResearch & DevelopmentNewsEnvironment
Buss Port Logistics Ships Out All Veja Mate Monopiles (Gallery)
Wind Farms

Buss Port Logistics Ships Out All Veja Mate Monopiles (Gallery)

Hamburg-based Buss Port Logistics has completed the near-shore logistics and storage operations related to all 67 of the world’s largest monopiles built by EEW Special Pipe Constructions GmbH for the 402MW Veja Mate offshore wind farm. Buss Port Logistics loaded the 1,300-ton monopiles from the fact

about 10 years ago
Scaldis to Install Kriegers Flak OSS Topsides
Wind Farms

Scaldis to Install Kriegers Flak OSS Topsides

Denmark’s Energinet.dk and Germany’s 50Hertz Transmission GmbH have awarded Scaldis Salvage and Marine Contractors NV with a contract to install two offshore substation topsides for the 600MW Kriegers Flak offshore wind farm in the Danish sector of the Baltic Sea. The contract includes the topsides

about 10 years ago
PNE Wind Sees Red
Wind Farms

PNE Wind Sees Red

German wind farm developer PNE Wind recorded EUR 1.4 million operating loss in the first six months of 2016, as compared to EUR 24 million operating profit reported for the same period a year earlier, as the high expenses related to the construction of wind farms dragged the company’s results down.

about 10 years ago
Van Oord Enters Home Stretch at Gemini
Wind Farms

Van Oord Enters Home Stretch at Gemini

As of yesterday, 138 wind turbines, representing over 90% of the total wind turbines, have been erected at the 600MW Gemini offshore wind farm, with 105 of the installed turbines producing power. This was reported within Northland Power’s Q2 and H1 2016 financial results. The company owns two offsho

about 10 years ago
Van Oord Enters Home Stretch at Gemini
Wind Farms

Van Oord Enters Home Stretch at Gemini

As of yesterday, 138 wind turbines, representing over 90% of the total wind turbines, have been erected at the 600MW Gemini offshore wind farm, with 105 of the installed turbines producing power. This was reported within Northland Power’s Q2 and H1 2016 financial results. The company owns two offsho

about 10 years ago
Three Is Not a Crowd off Block Island
Wind Farms

Three Is Not a Crowd off Block Island

Fred. Olsen Windcarrier’s installation vessel Brave Tern has installed three of the five GE Renewable Energy Haliade 150-6MW turbines at the Block Island Wind Farm. This is the first offshore wind farm to be installed in US waters and the first project Fred. Olsen Windcarrier has worked on outside o

about 10 years ago
Three Is Not a Crowd off Block Island
Wind Farms

Three Is Not a Crowd off Block Island

Fred. Olsen Windcarrier’s installation vessel Brave Tern has installed three of the five GE Renewable Energy Haliade 150-6MW turbines at the Block Island Wind Farm. This is the first offshore wind farm to be installed in US waters and the first project Fred. Olsen Windcarrier has worked on outside o

about 10 years ago
TWD and Barge Master Float Cost Saving Monopile Installation Tool
Wind Farms

TWD and Barge Master Float Cost Saving Monopile Installation Tool

Using Motion Compensate Pile Gripper during installation of super-sized monopiles in deeper waters can lead to cost reductions of up to 40%, according to the tool’s developers – Temporary Works Design (TWD) and Barge Master. Nowadays, most monopiles are installed using purpose built jack-up vessels,

about 10 years ago
Sif Joins BorWin Gamma Team
Wind Farms

Sif Joins BorWin Gamma Team

Dutch Sif Holding N.V. has been awarded a contract for the production of all tubular components for the jacket of the BorWin gamma platform. The contract includes the production of legs, bracings, pile sleeves and pin piles for the jacket. The project is being undertaken by Petrofac in consortium wi

about 10 years ago
Scottish Ministers, Developers Fight for Firths of Forth and Tay Offshore Wind Farms
Wind Farms

Scottish Ministers, Developers Fight for Firths of Forth and Tay Offshore Wind Farms

The Scottish Ministers have lodged an appeal against the Scottish Court of Session’s decision in favour of the petition filed by the Royal Society for the Protection of Birds (RSPB) to review the consent by the Scottish Ministers for four offshore wind farms in the Firths of Forth and Tay, Mainstrea

about 10 years ago
Scottish Ministers, Developers Fight for Firths of Forth and Tay Offshore Wind Farms
Wind Farms

Scottish Ministers, Developers Fight for Firths of Forth and Tay Offshore Wind Farms

The Scottish Ministers have lodged an appeal against the Scottish Court of Session’s decision in favour of the petition filed by the Royal Society for the Protection of Birds (RSPB) to review the consent by the Scottish Ministers for four offshore wind farms in the Firths of Forth and Tay, Mainstrea

about 10 years ago
A2SEA Gearing Up for Burbo Bank 2
Wind Farms

A2SEA Gearing Up for Burbo Bank 2

A2SEA’s self-propelled jack-up vessel Sea Installer is currently mobilising in Liverpool and preparing for the installation of 32 MHI Vestas 8MW turbines on DONG Energy’s 252MW Burbo Bank Extension, the Danish company said. The vessel is preparing to handle the new large turbines, which will make th

about 10 years ago
Dudgeon Substation Topside Sails Away
Wind Farms

Dudgeon Substation Topside Sails Away

The 1,700-ton topside built by Sembmarine SLP for the offshore substation of the 402MW Dudgeon offshore wind farm has sailed out of the port of Lowestoft, UK. The four-deck topside will be installed on a 1,500-tonne steel jacket which was put in place some 32 kilometres off Cromer, Norfolk, at the b

about 10 years ago
Polenergia to Start Building 600MW Baltic Middle III in 2019
Wind Farms

Polenergia to Start Building 600MW Baltic Middle III in 2019

Polenergia plans to start constructing the 600MW Baltic Środkowy III (Baltic Middle III) offshore wind farm in the Polish part of the Baltic Sea in 2019, with the commissioning of the wind farm planned for 2021 or 2022. The Polish energy company has recently become the first operator in Poland to ob

about 10 years ago
  • 1
  • …
  • 360
  • 361
  • 362
  • …
  • 505