Advertisement

Equipment

Film-Ocean ROV
Equipment

Film-Ocean beefs up ROV fleet

UK ROV services company Film-Ocean has expanded its ROV fleet with the addition of a further Quasar 150HP Workclass ROV. The company has seen four ROV systems added to the fleet over the past 12 months. The 3000-metre medium-sized Quasar ROV can carry out surveying, IRM, drill support and constructi

about 6 years ago
subsea compression system
Equipment

From idea to reality: five years since the first subsea compression system

Five years after the kick off, the subsea compression system covering an area the size of a football field, at Equinor-operated Åsgard development in the Norwegian Sea, still runs like clockwork. The entire Åsgard field is one of the largest developments on the Norwegian continental shelf, embracing

about 6 years ago
Bombora mWave WEC
Equipment

Bombora taps Kingswood Engineering for mWave intervention tool structure

Ocean energy solutions company Bombora has recently selected Kingswood Engineering for the fabrication of the intervention tool structure for the mWave wave energy converter demonstrator. The intervention tool structure is the floating structure which facilitates the subsea installation and removal

about 6 years ago
Corvus Energy batteries will be installed on the five all-electric ferries being built for GVB at Holland Shipyards Group in the Netherlands
Equipment

Corvus Energy to supply lithium-ion battery-based ESS for GVB’s all-electric ferries

Corvus Energy has been selected by Holland Ship Electric to supply lithium-ion battery-based energy storage systems (ESS) for five new all-electric ferries being built by Holland Shipyard Group for Amsterdam’s municipal public transport provider GVB. The ferries will be equipped with air-cooled Corv

about 6 years ago
Proserv faility
Equipment

Proserv launches two new facilities

Proserv Controls has formally unveiled two new facilities in Mussafah, Abu Dhabi and Cumbernauld, near Glasgow, Scotland. Despite the on-going global challenge of the Covid-19 pandemic, the Aberdeen based firm has proactively pursued the establishment of the new sites in recent months as it continue

about 6 years ago

Advertisement

Eco Reachstacker
Equipment

Maritime Transport chooses eco-friendly Kalmar Eco Reachstackers for Wakefield terminal

Kalmar, part of Cargotec, has signed a deal to supply two Kalmar Eco Reachstackers that will help UK’s multimodal logistics operator Maritime Transport Ltd (Maritime) cut fuel costs and carbon emissions while addressing growing demand at its rail terminal in Wakefield, England.

about 6 years ago
Subsea Innovation hang-off for Flexlife
Equipment

Subsea Innovation hang-off system for Flexlife

Subsea Innovation, a Tekmar Group company, has designed, built, tested, and supplied a bend stiffener repair hang-off clamp for flexible riser specialist Flexlife. To meet the tight project schedule as well as planned offshore installation campaign, the entire project took 6 weeks to deliver from re

about 6 years ago
Wartsila scrubbers
Equipment

Study: Scrubbers have lower well-to-wake CO2 footprint than low-sulphur fuels

Using exhaust gas cleaning systems (scrubbers) or low-sulphur fuel oils to meet the IMO 2020 Sulphur Cap both result in an increase of well-to-wake CO2 emissions, according to a recent study carried out by research and consultancy firm CE Delft. A scrubber requires energy which is generated by engin

about 6 years ago
MDL appointments
Equipment

MDL eyes global growth with new team boost

MDL has implemented organisational changes to its management and business development teams as it targets global growth in the “new normal” energy market. Andrew Blaquiere, previously VP Americas, joins the MDL board as managing director and will be overseeing the day-to-day business operations. The

about 6 years ago
Core Project Phase 1
Equipment

Subsea 7 taps JDR for Elgood umbilical

Subsea umbilical and cable supplier JDR has agreed a new contract with Subsea 7 to supply a 9.3-kilometre production and control umbilical, topside equipment and subsea terminations for the Elgood field in the UK Continental Shelf. The umbilical delivery will take place in Q2 2021 and will connect t

about 6 years ago

Advertisement

shore power
Equipment

Port of Tallinn gets its 1st shore power solution

Tallink Grupp’s vessel Victoria I was connected to shore power in Tallinn Old City Harbour for the first ever shore power charging in Estonia on 11 September.

about 6 years ago
Aquatic equipment for MDL
Equipment

Aquatic supports MPL Nigeria campaign

Aquatic has completed the work scope for Marine Platforms Ltd (MPL) to support its Anyala Madu project offshore Nigeria. The Acteon company supplied the personnel and equipment to assist with the installation of multiple, different sized products. Specifically, Aquatic provided an HLS c/w 50Te tensi

about 6 years ago
Premier’s Tolmount platform heads for North Sea
Equipment

Premier’s Tolmount platform heads for North Sea

UK oil and gas firm Premier has seen the jacket and topsides sent off to their final destination at the Tolmount field in the Southern North Sea. The infrastructure will meet the Sleipnir heavy lift vessel for installation in late September / early October. The 500 Bcf Tolmount development is on tra

about 6 years ago
The Switch: Shipyards, shipping must shift away from a blinkered approach to CAPEX
Equipment

The Switch: Shipyards, shipping must shift away from a blinkered approach to CAPEX

Shipyards, and the industry that supports them, must shift away from a blinkered approach to CAPEX, Asbjørn Halsebakke, Director, Technical Solutions, Marine, Yaskawa Environmental Energy / The Switch, argues. “By expanding our horizons beyond cost, and considering benefits and value,” he says, “all

about 6 years ago