Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Offshore Wind

Loading filters...
TurbinesOperations & MaintenanceCablingGridSubseaProject & TendersWind FarmsBusiness & FinanceInfrastructureVesselsHydrogenTechnologySurveys & InterventionsBusiness Developments & ProjectsEquipmentMarket OutlooksGreen MarineHybridPropulsionResearch & Development
Trianel Windpark Borkum II offshore wind farm
Offshore Wind

Siemens Gamesa to service Senvion turbines at Trianel Windpark Borkum II

Siemens Gamesa will service the offshore wind turbines at the Trianel Windpark Borkum II (TWB II) in Germany, which comprises 32 Senvion 6.33-MW turbines. The contract, signed in late June, is effective as of 1 August and covers full scope maintenance for five years, including extension options. The

about 6 years ago
Subsea-7-Nets-Another-Offshore-Wind-Contract-in-Taiwan
Offshore Wind

Subsea 7 nets another offshore wind contract in Taiwan

Subsea 7 has secured a contract for the installation of the submarine cable system at an undisclosed offshore wind project in Taiwan. Project engineering will commence immediately at Seaway 7’s offices in Leer, Germany, and in Taipei, Taiwan, while the offshore activities are expected to commence in

about 6 years ago
Front entrance of the Boardwalk commercial sites, where Atlantic Shores will take the building shown on the left
Offshore Wind

Atlantic Shores Offshore Wind rents place from Stockton University

Atlantic Shores Offshore Wind and Stockton University have entered a sublease agreement for 180 square metres of commercial space, where the offshore wind developer will set up an Educational and Community Outreach Center to host informational events for the local community. The premises are located

about 6 years ago
UK starts offshore transmission network review
Offshore Wind

UK starts offshore transmission network review

The UK has launched a review into the existing offshore transmission regime to address the barriers it presents to further significant deployment of offshore wind. The current approach to designing and building offshore transmission was developed when offshore wind was a nascent sector and industry

about 6 years ago
DEME's Sea Installer and Sea Challenger vessels installing Borssele 1 & 2 wind turbines
Offshore Wind

DEME’s duo busy at Borssele 1 & 2 offshore wind farm

DEME’s vessels Sea Installer and Sea Challenger are currently working together at the Borssele 1 & 2 offshore wind farm, where they have so far installed 55 Siemens Gamesa 8 MW wind turbines. [The article continues below the image.] The vessels are working as a tandem as part of DEME’s duo-vessel so

about 6 years ago
A photo of Siemens Gamesa SG 5.0-145 turbine installed onshore
Offshore Wind

Vietnam’s largest nearshore wind farm to feature Siemens Gamesa turbines

Siemens Gamesa has received an order for the 75 MW Tan Thuan nearshore wind farm in Vietnam, for which it will deliver its SG 5.0-145 turbines. The Tan Thuan wind farm, due to be commissioned in mid-2021, is the largest nearshore project in Vietnam to date, according to Siemens Gamesa. The company,

about 6 years ago
Aerial view, Machrihanish Airbase Community Company Business Park and Airport
Offshore Wind

SGN working on world’s first offshore wind-powered hydrogen heating project

The UK gas network operator SGN has launched a project that will be world-first to employ a direct supply of offshore wind power to produce green hydrogen energy for heating. The project will start with heating around 300 homes in Fife, Scotland, using clean gas produced by an electrolysis plant, po

about 6 years ago
EGS completes geotechnical campaign tour offshore Taiwan
Offshore Wind

EGS completes geotechnical campaign tour offshore Taiwan

The EGS Group has completed a series of geotechnical campaigns on offshore wind farms in Taiwan. The DP2 geotechnical vessel Greatship Rachna, equipped with EGS’s EGSA-25 twin derrick geotechnical drilling rig, worked continuously for ten months in Taiwanese waters on three geotechnical campaigns fo

about 6 years ago
Palfinger gear for Edda Wind quartet
Offshore Wind

Palfinger gear for Edda Wind quartet

Palfinger has won a contract to equip four new service vessels for Edda Wind, Østensjø Group’s offshore wind segment, with lifting solutions as well as lifesaving appliances. The company’s Ibérica office won the contract to supply the package including ten foldable knuckle boom cranes, four lifeboat

about 6 years ago
Floating wind turbines and vessels at sea
Offshore Wind

Carbon Trust forecasts 70 GW of floating wind by 2040

The Carbon Trust sees 70 GW of floating wind installed capacity by 2040, according to a new summary report on the findings from the second phase of the Floating Wind Joint Industry Project (JIP). The report outlines technology challenges that need to be addressed in order so the commercialisation of

about 6 years ago
Teknotherm-HVAC-Systems-for-New-Østensjø-Offshore-Wind-Vessels
Offshore Wind

Teknotherm HVAC systems for new Østensjø offshore wind vessels

Teknotherm Marine has won a contract to supply the heating, ventilation & air-conditioning (HVAC) and refrigeration systems for Østensjø’s four new offshore wind supply vessels. The onboard systems have been designed to optimize the energy efficiency of the vessels, minimizing their carbon footprint

about 6 years ago
The Green Jade vessel, image rendering of the vessel at sea with green hills in the background
Offshore Wind

Wärtsilä gets big order for Green Jade offshore wind installation vessel

Wärtsilä has received an order for multiple solutions for Green Jade, the first floating heavy-lift offshore wind installation vessel to be built in Taiwan. The vessel, owned by CSBC-DEME Wind Engineering (CDWE), will be equipped with four of Wärtsilä’s 46DF and two 20DF dual-fuel engines, as well a

about 6 years ago
Fugro-Picks-Sonardyne-Tech-for-US-Offshore-Wind-Work
Offshore Wind

Fugro picks Sonardyne tech for US offshore wind work

Fugro has selected underwater positioning technology from Sonardyne Inc. for its upcoming activities at offshore wind projects in the U.S. Fugro ordered three Sonardyne Mini-Ranger 2 Ultra-Short BaseLine (USBL) underwater positioning systems to support shallow-water site characterization surveys and

about 6 years ago
New integrated cable protection solution from Balmoral
Offshore Wind

New integrated cable protection solution from Balmoral

Balmoral, a provider of cable protection systems (CPS) for inter array and export cables for fixed and floating offshore wind installations, has created an integrated CPS the company reports is unique. The Discovery Unit, a combination of product R&D, materials and testing specialists, created the i

about 6 years ago
  • 1
  • …
  • 299
  • 300
  • 301
  • …
  • 2153