
Neart na Gaoithe Offshore Wind Farm Limited (NnGOWL) has announced that it is planning to conduct a pre-lay grapnel run (PLGR) and commence cable lay out for the first campaign of six inter-array cables and one interconnector between the two offshore substations, within the wind farm’s site in Scotl

Hoegh Gannet, a floating storage and regasification unit (FSRU) serving the Elbehafen LNG terminal in Brunsbüttel, Germany, has started supplying gas into the grid as regular operations are expected to commence in April. The Elbehafen LNG terminal will be Germany’s third FSRU-based terminal followin