
The seabed clearance phase for the second electrical interconnector between Malta and Italy has begun, aiming to make the cable corridor route debris-free and safe for cable installation. Following the completion of the detailed marine route survey carried out by Italy’s Next Geosolutions (NextGeo),

Lithuanian liquefied natural gas (LNG) terminal operator KN Energies has awarded Aker Solutions with a front-end engineering and design (FEED) contract for its CO2 transshipment terminal infrastructure project in Klaipėda. The planned terminal is expected to have a capacity of approximately 2.8 mill