
The laying of the subsea cable that connects the DolWin epsilon platform to land has been completed. The platform and the cables, part of TenneT’s DolWin5 grid connection, will transmit the electricity generated by Ørsted’s Borkum Riffgrund 3 offshore wind farm to the German grid on land. The DolWin

Huisman has signed a contract with Dong Fang Offshore (DFO) for the delivery of a modular cable-lay system that will be fitted onto DFO’s vessels, including the construction service operation vessels (CSOVs) being built by Vard for the Taiwan-based offshore wind vessel provider. For Huisman, this ma