Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Technology

Loading filters...
Offshore WindResearch & DevelopmentDredgingBusiness & FinanceEquipmentVesselsMarine EnergyOperations & MaintenanceProject & TendersAuthorities & Government
AXYS Deploys Two Dual-LiDAR Floaters at Catapult’s Met Mast
Technology

AXYS Deploys Two Dual-LiDAR Floaters at Catapult’s Met Mast

AXYS Technologies has deployed two dual-LiDAR WindSentinel floating LiDAR systems, utilising the Offshore Renewable Energy (ORE) Catapult’s offshore anemometry mast. This will be the world’s first deployment of a floating LiDAR system to feature two LiDARs, as each system has an additional Zephir 30

about 11 years ago
CHEC Inks San Antonio Terminal Contract
Technology

CHEC Inks San Antonio Terminal Contract

China Harbour Engineering Company (CHEC), a company engaged in the design and construction of transportation infrastructure, dredging and heavy machinery manufacturing business, has signed a $44 million contract for extension of San Antonio Terminal in Valparaiso, Chile. The project involves constru

about 11 years ago
PLA to Introduce ‘London Titan’ at Seawork
Technology

PLA to Introduce ‘London Titan’ at Seawork

Europe’s largest commercial marine and workboat exhibition, Seawork International, has announced that the Port of London Authority’s (PLA) new 36-meter mooring maintenance vessel, London Titan, built at a cost of £7 million, will be officially unveiled at the opening day of the event in June. Follow

about 11 years ago
VIDEO: Construction timelapse of BlueTec tidal platform
Technology

VIDEO: Construction timelapse of BlueTec tidal platform

The device is currently being assembled at Niron Staal Amsterdam B.V., a specialized steel construction and machining company located in the port of Amsterdam. BlueTec tidal platform will be the first floating tidal platform to power Dutch households. The platform is a part of Texel project, a colla

about 11 years ago
ORE Catapult sets up subsea installation technology workshop
Technology

ORE Catapult sets up subsea installation technology workshop

The workshop will address various aspects associated with subsea installation, specifically focusing on innovations which can aid cost reduction. Foundations, substructures and installation techniques have been identified as areas in which ORE Catapult believes the industry must focus their efforts

about 11 years ago
Picture of the Day: New Suez Canal Scheme
Technology

Picture of the Day: New Suez Canal Scheme

The Suez Canal dredging scheme comes as a part of the mega New Suez Canal project. Besides dredging, the project includes development of several seaports in the three governorates bordering the canal, Suez, Ismailia and Port Said. Also included in the project is a seaport in the South Sinai city of

about 11 years ago
Caterpillar Unveils New Excavator
Technology

Caterpillar Unveils New Excavator

The new Cat® 313F L GC hydraulic excavator is designed for the user whose bottom line depends on reliable performance at a low cost per hour. The machine features an efficient Cat C3.4B engine that meets US EPA Tier 4 Final/EU Stage IIIB emission standards and that’s light on fuel with no need for d

about 11 years ago
Venice Beach Renourishment About to Resume
Technology

Venice Beach Renourishment About to Resume

The U.S. Army Corps of Engineers anticipates sand placement on Venice Beach to tentatively resume today, weather permitting. The shore protection project was temporarily delayed by a mechanical problem February 15 that caused the shutdown of dredging operations. During the dredging operations, the L

about 11 years ago
DP World London Gateway Invests in 3rd Berth
Technology

DP World London Gateway Invests in 3rd Berth

Kalmar, part of Cargotec, has signed a significant repeat automation contract with DP World London Gateway to deliver an additional system of 20 automatic stacking cranes as the port continues its expansion program and invests in a third berth following the successful launch of berths 1 and 2. Kalma

about 11 years ago
First BlueTec Tidal Platform to Be Named
Technology

First BlueTec Tidal Platform to Be Named

Naming ceremony for the first BlueTec tidal platform will be held on April 9 in Den Helder, the Netherlands. Shortly after the event, the tidal turbine will be installed offshore the isle of Texel and will start generating power for a Texel-based facility. BlueTec is a joint project of 12 Dutch high

about 11 years ago
IHC Mining Joins World Ocean Council
Technology

IHC Mining Joins World Ocean Council

IHC Mining, part of Royal IHC (IHC), has become a member of the World Ocean Council (WOC) to add to the growing global industry alliance for “corporate ocean responsibility”. As a leader in responsible dredging and offshore mining activities, IHC Mining is expanding its scope as one of the pioneers

about 11 years ago
Long Beach Island Dune and Berm Scheme Set for April
Technology

Long Beach Island Dune and Berm Scheme Set for April

The U.S. Army Corps of Engineers, Philadelphia District, has announced a scheduling change for the initial construction of the Long Beach Island Coastal Storm Damage Reduction project. On December 5, 2014 the U.S. Army Corps of Engineers awarded a contract to the Great Lakes Dredge and Dock Company

about 11 years ago
BioPower completes bioWave construction
Technology

BioPower completes bioWave construction

BioPower System has completed the construction of its bioWave wave energy device that is scheduled for ocean deployment in 2015. The steel structures that make up the bioWAVE 250 kW pilot unit have been fabricated and are currently undergoing machining, painting, and assembly, according to the compa

about 11 years ago
BlueTec tidal platform deployment date set
Technology

BlueTec tidal platform deployment date set

BlueTec tidal platform, a floating platform that generates energy from tides, is scheduled to be deployed in April, off the isle of Texel, Netherlands. The naming ceremony will be held on April 9, 2015, in Den Helder, the Netherlands. Shortly after the naming ceremony, the floating tidal platform wi

about 11 years ago
  • 1
  • …
  • 935
  • 936
  • 937
  • …
  • 1374