Croatia: 3. MAJ on Track to Deliver Yard No. 717 on Time

 3. MAJ on Track to Deliver Yard No. 717 on Time

Construction works on Yard No. 717, the second in a series of four tankers that the shipbuilder 3. MAJ is constructing for the Swedish owner WISBY TANKERS, are in full swing in order to meet delivery deadline of February 2013.

The sea trials for the vessel are set for February 13th 2013.

The tanker, designed to carry concrete, oil and chemicals, is 133 meters long and 23 meters wide. The newbuild features the loading capacity of 15,000 DWT and is propelled by the 3.MAJ-Wartsila 6 RT Flex 35 engine (MAIN ENGINE OUTPUT 4500 kW at 144 min-1).

CLASS: BUREAU VERITAS

AUT-UMS, SYS-IBS-1, SYS-NEQ-1

MON-SHAFT, INWATERSURVEY, CLEANSHIP (C), VCS

Oil tanker – Asphalt carrier (maximum cargo temperature 250 °C),

Chemical tanker, Unrestricted navigation.

[mappress]
Shipbuilding Tribune Staff, February 8, 2013