10000 results found for 'Denmark'

10000 results found for 'Denmark'
Order results by

A list of search results

  • 31 October 2012

    Bladt’s new 4000×145 mm plate roll has been installed and is now in full operation at their production facilities in Aalborg, Denmark. The new plate roll has the capacity to roll plates up to four meters wide and is one of the largest in Europe. In pace with everything in the industry increasing in size, […]

  • 9 September 2013

    Invited by Offshoreenergy.dk the international offshore wind industry gathers in Denmark for company speed dating. Large foreign companies go to Esbjerg, Denmark, on 11th to 12th December 2013. They are participating in the annual event OWIB – Offshore Wind Industry Business to business event – arranged by Offshoreenergy.dk in cooperation with Danish Wind Industry Association […]

  • 10 July 2012
    Business & Finance

    At SMM 2012, which takes place from 4 – 7 September, 2012, in Hamburg, Danfoss will be exhibiting its marine portfolio, including the frequency converter-family that holds eight marine approvals. Visitors will also be introduced to a variety of sensors, such as the cylinder pressure sensor that reduces fuel consumption and increases engine life. The […]

  • 20 March 2015
    Business & Finance

    State of Green has launched the White Paper on wind in collaboration with the Danish Wind Industry Association and leading Danish actors across the wind power value chain. Integrating 10, 20, 30, 40 or 50% wind energy in the electricity system, agreeing on the political framework for large investments and getting the citizens on board for […]

  • 5 April 2012
    Environment

    The first survey of how offshore wind farms affect the fish life is complete. It shows that wind turbines and fish co-exist in perfect harmony. The stock of some fish species has actually increased. While the preparations for erecting the first wind turbines at Anholt Offshore Wind Farm are well under way, a new report […]

  • 14 March 2012

    2011 was a bad year for Denmark’s largest construction and civil engineering group, which emerges from the financial year with a pre-tax margin of minus 3.6% and a pre-tax loss of DKK 335 million. The financial statements are, as previously announced, negatively affected by losses on isolated projects, and in addition there are provisions, with […]

  • 14 March 2012

    2011 was a bad year for Denmark’s largest construction and civil engineering group, which emerges from the financial year with a pre-tax margin of minus 3.6% and a pre-tax loss of DKK 335 million. The financial statements are, as previously announced, negatively affected by losses on isolated projects, and in addition there are provisions, with […]

  • 20 March 2012

    RESON announced that GSE Rentals have once again shown their commitment to investing in RESON’s SeaBat technology. GSE Rentals have procured their first SeaBat 7125SV2 system to add to their existing pool of RESON SeaBat systems. The latest SeaBat 7125SV2 system delivered to GSE features the sought after option of FlexMode as well as a […]

  • 19 July 2011
    Business & Finance

    As operator of offshore Licence 12/06, PA Resources’ subsidiary PA Resources UK Limited announces initial results of the Broder Tuck exploration well (5504/20-4), located approximately 10 kilometres south of Gorm Field in the Danish part of the North Sea. Following some initial drilling problems, the well was drilled as a vertical well to a total […]

  • 8 August 2012
    Business & Finance

    Senior Vice President for Group HR Bill Allen has decided to leave the A.P. Moller – Maersk Group and return to the USA after seven years in Denmark. His successor will be Lucien Alziari, whom brings a strong track record from major global companies, such as Avon and PepsiCo. “The past seven years with the […]

  • 17 January 2012
    Business & Finance, Research & Development

    In July 2011 A2SEA acquired a 29% share interest in the Danish cable installation company CT Offshore. A2SEA has now decided to increase their shareholding in the company to 67%. The remaining 33% of the shares are still owned by CT Offshore’s founder and CEO, Paw Cortes. The company will stay at its present address […]

  • 23 January 2012

    On 19 January, the Danish Maritime Authority hosted a Japanese delegation from the Ministry for Land, Infrastructure, Transport and Tourism, as well as from Japanese port bureaus and ports. Japanese ports are facing increasing competition from other container ports in Asia. The purpose of the visit was to present the plans of the Japanese government […]

  • 19 October 2017
    Research & Development, Technology

    The TetraSpar floating wind foundation, brought forward by Henrik Stiesdal – a Danish inventor and former Chief Technology Officer at Siemens Wind Power – has won a DKK 9 million grant (approx. EUR 1.2 million).

  • 20 September 2010

    The world’s largest networking event for the international offshore wind industry takes place on November 17 in Denmark. This November international businesses in design, production, setting-up and operation of offshore wind turbines gather at the OWIB – the Offshore Wind International Business2Business Event – to discuss opportunities for collaboration on future offshore wind projects. OWIB […]

  • 18 November 2016
    Authorities & Government, Business & Finance

    A broad political coalition in the Danish parliament has reached an agreement to shift the so-called Public Service Obligation (PSO) tariff for renewables away from electricity bills and to the national budget, thus clearing the path for the 350MW near shore wind projects recently awarded to Vattenfall, the Danish Wind Industry Association (DWIA) reports. Up to now, Denmark […]

  • 31 October 2013

    The LORC nacelle testing facility, LNT, is under construction and the work is on track. The hall, which will house the most advanced indoor tests of full-scale wind turbine nacelles is complete with the removable roofs ready to be installed. The foundation upon which the powerful machinery will be placed has been cast and the […]

  • 6 March 2013

    DONG Energy published the company’s 2020 strategy. Here is the short version. At the same time as DONG Energy announced its annual accounts for 2012, the strategy for 2020 was disclosed. DONG Energy has set clear ambitions for four focal areas. DONG Energy will: 1. Quadruple installed offshore wind capacity 2. Double oil and gas […]

  • 24 April 2012
    Business & Finance

    ERRA A/S announced that it has canceled the last newbuilding contract with Rushan Shipyard Co. Ltd, as a part of the company’s reconstruction policy. Previously, Erra A/S concluded contracts for delivery of three new chemical tankers with the Chinese shipyard Rushan Shipyard Co. Ltd. in Rushan. The construction contract for the first newbuild vessel was […]

  • 16 March 2012
    Business & Finance

    TORM has entered into an agreement to cancel one MR product tanker newbuilding, which was scheduled for delivery in the second quarter of 2014. The parties have agreed not to disclose the terms. “With this agreement, TORM’s order book is empty. A substantial reduction in CAPEX commitments has been a key element towards the Company’s […]

  • 14 March 2012

    In connection with the review of the MT Højgaard Group’s projects a revaluation of the risk factors for a number of projects has been performed. This revaluation necessitates further exceptional provisions for the financial year 2011. In consequence of the revaluation, the Group’s financial performance for 2011 shows a loss with a pre-tax margin of […]

  • 22 April 2012

    The EWEA Annual Event 2012 in Copenhagen has now drawn to a close. But what were the main messages of the Chairs of the six themed “tracks” – from policy to financing – to the wind energy industry and politicians? Uncertainty is very high in the market, in particular for the post-2020 years, Jan Serup […]

  • 14 March 2012

        In the last few days, the Board of Directors of DONG Energy has uncovered circumstances that have led to a unanimous Board having lost confidence in Anders Eldrup. Fritz Schur, Chairman of DONG Energy’s Board of Directors, states:  ”The decision for Anders Eldrup to step down has nothing to do with the examination […]

  • 10 June 2013

    So far, it has often been necessary to use external diesel generators to secure the power supply in connection with the completion of installation and commissioning of offshore wind turbines because the connection to the power grid has not been ready. In the Anholt project, all wind turbine positions have been energised at an early […]

  • 19 July 2012

    Late last night, the final foundation for the Anholt Offshore Wind Farm was finished. The crew had been working hard through the day to finish the final one of the 111 foundations which they have been working on for the past months. Now the last ones are finally ready to be shipped from Bladt Industries […]

  • 28 December 2011
    Ports & Logistics

    On 25 December MPI Discovery arrived at the Port of Esbjerg, where it will load wind turbines for the World’s largest offshore wind farm – London Array. Blue Water Shipping is agent on behalf of MPI Offshore, and is responsible for the loading of the wind turbines for London Array – all together 175 turbines […]