10000 results found for 'Denmark'

10000 results found for 'Denmark'
Order results by

A list of search results

  • 20 May 2011
    Business & Finance

    At a major event at its Diesel Research Centre in Copenhagen Thursday, MAN Diesel & Turbo presented its ME-GI gas engine to a 300-strong invited audience of customers, licensees and journalists. The unveiling of the two-stroke engine represents the culmination of many years’ work that began in the 1990s with the company’s prototype MC-GI dual-fuel […]

  • 18 September 2012
    Technology

    Danish based Fyns Kran Udstyr has developed a hydraulic yoke that makes lifting, maneuvring and mounting wind turbine nacelles quicker and safer. Wind turbines present a viable source of energy, but lifting and handling the large wind turbine nacelles requires finesse. Assembling the wind turbines can be a difficult venture without the proper equipment which […]

  • 15 July 2011
    Operations & Maintenance, Research & Development

      Due to extensive utilisation for, eg harbour piers and coast protection facilities, rock reefs have become a rare natural element in Denmark. And this is a shame for the large variety of flora and fauna that lives on and by the reefs. Now, lobsters, crabs and a neumber of fish species will benefit from […]

  • 10 January 2012
    Research & Development, Technology

    With a new and innovative technology, it is now possible to comply with exciting legislation on noise reduction during installation of offshore wind turbines. According to legislation from the EU the sound emissions from the installation of windmills at sea must be reduced so the threat to the marine mammals are minimised. Traditionally, the water […]

  • 12 January 2023
    Authorities & Government, Business & Finance, Business Developments & Projects, Carbon Capture Usage & Storage, Environment, Outlook & Strategy, Regulation & Policy, Transition

    The European Commission has given its approval for a €1.1 billion scheme to support the roll-out of carbon capture and storage (CCS) technologies in Denmark. The aid will be awarded through a competitive tendering procedure open to companies active in any industrial sector, including the waste and energy sectors, with conclusion to take place this […]

  • 5 October 2011

      The personnel are working flat out to complete the O&M buildings at Grenaa Harbour. The assembly of the elements for the future welfare and administration building is almost complete, and the shape of the building now looks like the outline on the site sign. The next step is the light external wall on the […]

  • 5 January 2012

    In 2010, DONG Energy performed detailed geophysical surveys of the seabed in the wind farm area. In connection with the surveys, a few objects with magnetic signs, indicating that it might be old bombs, were located.. In connection with the surveys, a few objects with magnetic signs, indicating that it might be old bombs, were […]

  • 2 January 2013

    CT Offshore announces that it has received the International Organization of Standardization 9001:2008 certification for its complete services package which include; Installation, Survey & Maintenance, Survey and Cable recovery. The certification indicates that CT Offshore office and vessels conforms to a quality management system which can consistently provide a product or service that meets customer […]

  • 18 March 2021
    Business & Finance, Business Developments & Projects, Collaboration, Infrastructure, Outlook & Strategy

    The Nordic Investment Bank (NIB) has signed a 10-year loan agreement with Danish national transmission system operator Energinet to co-finance the construction of the Viking Link interconnector between the UK and Denmark.

  • 27 October 2010
    Business & Finance

    Vestas has announced plans to cut around 3,000 jobs as part of its plan to cut excess capacity in Europe. The move was revealed as part of… James Quilter (windpowermonthly) [mappress] Source: windpowermonthly, October 27, 2010;

  • 9 August 2012

    Stringent conditions for approving the passage of Kattegatruten’s new fast ferry between Aarhus and Kalundborg stipulate that the fast ferry Dolphin Jet will have to reduce its sailing speed to 16 knots in Kalundborg Fjord, while the company’s cargo ship will be sailing at a speed ranging between 18 and 19 knots, JP Arhus writes. […]

  • 26 August 2011
    Business & Finance

      Last weekend the platform supply vessel Durga Devi (ex VOS Prevail) was taken over by the Singapore-based ship owner Chellsea Pte Ltd in the port of Esbjerg. Niels Winther acted as owner’s agent and handled the local formalities. In addition to this, a ceremony in connection with the handover of the vessel was arranged […]

  • 29 January 2013
    Business & Finance, Operations & Maintenance

    New Year’s Eve 2011, 19.00 hours: the rest of Denmark is gathered for their celebrations. The installation vessel ‘Svanen’ is hammering a foundation pile into the seabed approximately 20 kilometres north east of Grenaa. The pile marks the beginning of construction of DONG Energy’s new facility, Anholt Offshore Wind Farm. In June 2012, the cable-laying […]

  • 13 December 2010

    As Belwind nv celebrates the opening of Bligh Bank Offshore Wind Farm today, Vestas marks this its third offshore wind farm inauguration this year. As the pioneers of offshore wind Vestas once again makes its mark on the industry by opening a record three offshore wind farms in one year. 2010 has brought along the […]

  • 29 August 2012

    On Friday afternoon, August 24, the employees at Bladt finished the two transition pieces that the company has fabricated for DONG Energy. The two 350 tonnes transition pieces and the monopiles, each 406 tonnes of weight, make up the foundations for two of Siemens’ new 6 MW wind turbines that will be tested at Gunfleet […]

  • 2 November 2012

    DHI has embarked on a new two-year project in partnership with the Strategic Initiative for Ocean Energy Development (SI OCEAN). The project, supported by the Intelligent Energy Europe Program, aims to: Identify practical solutions to remove a range of barriers to large scale wave and tidal energy deployment To deliver a common strategy for maximising […]

  • 4 July 2012
    Research & Development

    The global wind power supply chain faces a future characterized by stagnating global economic growth, low profit margins and waning government policy support. In the face of such headwinds market consolidation and/or contraction in the industry becomes ever more important, argues MAKE Consulting’s latest Global Wind Turbine Supply Chain report.  Globally, heightened competition and reduced […]

  • 26 March 2012

    MAKE Consulting has published its 2012 Global Wind Power Market Outlook report. MAKE continues to see significant growth in the global wind power markets with an expected compound annual growth rate of 7% – a downgrade from MAKE’s last quarterly forecast of a 10% 5-year CAGR. High growth is expected in new emerging markets and […]

  • 31 July 2025
    Business & Finance, Business Developments & Projects, Vessels

    Bermuda-headquartered crude oil tanker company DHT Holdings has entered into a $308.4 million senior secured credit facility for the post-delivery financing of four of the company’s newbuilds currently under construction in South Korea. The vessels in question are a quartet of environmentally friendly very large crude carriers (VLCCs) booked by DHT Holdings in February last […]

  • 22 November 2011
    Business & Finance, Equipment

    MT Højgaard, the company who have deployed most offshore wind foundations globally, have teamed up with foundation specialists Seatower to offer “cranefree” gravity foundations. The new foundations have been developed specifically for the deeper waters and bigger turbines that will soon become prevalent in European offshore wind projects. The Cranefree foundations come out of a […]

  • 5 March 2012
    Business & Finance, Operations & Maintenance

    It is said that the sea erases all tracks; however, there is equipment which can see through the water, and one of the tools, which can give you an impression of the conditions at the seabed, is a so-called multibeam. The multibeam is a device, which can give you an exact picture of the surface […]

  • 9 September 2012
    Operations & Maintenance

    Jumbo has successfully completed the TP-installation (Transition Pieces) for the Anholt Offshore Wind Farm, off the Danish coast. Jumbo’s DP2 Heavy Lift Vessel Jumbo Javelin installed the 111 TP’s with a record-breaking installation rate of 3 TP’s per day. The transport, installation, access to the TP’s and grouting was done without any Lost Time Injuries […]

  • 9 September 2012
    Operations & Maintenance

    Jumbo has successfully completed the TP-installation (Transition Pieces) for the Anholt Offshore Wind Farm, off the Danish coast. Jumbo’s DP2 Heavy Lift Vessel Jumbo Javelin installed the 111 TP’s with a record-breaking installation rate of 3 TP’s per day. The transport, installation, access to the TP’s and grouting was done without any Lost Time Injuries […]

  • 9 July 2015
    Equipment, Operations & Maintenance

    Denmark’s electricity grid is to be reinforced with more than 290 km of Nexans’ XLPE cables as part of ENERGINET.DK’s JFK & Storstrømmen project. Nexans will supply two submarine cable systems and two underground cable systems in Denmark in a contract worth approximately €25 million. Nexans will provide a 150 kV single core cross-linked polyethylene […]

  • 11 December 2012
    Research & Development

    Today DONG Energy and Vestas Wind Systems have entered into a cooperation agreement on the testing of Vestas’ V164-8.0 MW wind turbine at Test Centre Østerild in Denmark. Through this agreement, DONG Energy becomes involved earlier in Vestas´ development of the V164-8.0 MW offshore wind turbine than previously envisaged. This ensures DONG Energy a detailed […]