Total Begins Production from Dalia Phase 1A
Total has started production from Dalia Phase 1A, a new development on its deep offshore operated Block 17, located 135 km off the coast of Angola.
Dalia Phase 1A will develop additional reserves of 51 million barrels (Mb) and will contribute 30,000 barrels per day (b/d) to the block’s production.
“The Dalia FPSO came on stream nearly nine years ago and with the addition of Phase 1A will still produce around 200,000 b/d. It is the latest milestone in the success story of Block 17, Total’s most prolific license with cumulative production reaching two billion barrels in May 2015,” explained Arnaud Breuillac, President Exploration & Production.
“Dalia Phase 1A demonstrates Total’s commitment to maximizing value through the optimal use of existing facilities. These types of profitable satellite tie-back developments play an important role in maintaining production levels and generating additional free cash flow for the Group.”
The Dalia Phase 1A project involves the drilling of seven infill wells tied back to the Dalia Floating Production Storage and Offloading (FPSO) unit.
[mappress mapid=”12090″]
List of related news articles
-
Posted: about 1 month ago
Total hires Norco for work on four FPSOs off Angola
Angolan arm of French oil major Total has awarded a maintenance contract to energy storage equipment...
Posted: about 1 month ago -
Posted: 8 days ago
Energean takes over Total stake in block off Greece
Energean has completed its acquisition of Total’s entire 50 per cent working interest share and oper...
Posted: 8 days ago -
Posted: about 1 month ago
Total boasts positive test results from South African well
Total has delivered positive test results that show high condensate yield and excellent reservoir co...
Posted: about 1 month ago -
Posted: 12 days ago
Total enters new block offshore Egypt
An international consortium led by Total and EGAS have signed an exploration and production agreemen...
Posted: 12 days ago