Brazil: Petrobras, Jogmec to Conduct Feasibilty Study on Flexible Pipe Design for Pre-Salt Cluster

 

Petrobras has signed a Specific Agreement with Jogmec – Japan Oil, Gas, and Metals National Corporation, with the aim of commencing a technical feasibility study on flexible pipes for oil production in the pre-salt cluster.

This study is the second collaboration between the two companies. The relationship between Petrobras and Jogmec began in December 2005, when they signed a memorandum of understanding for collaboration on activities of mutual interest related to oil and gas exploration and production, health, safety and environment, and sector-related research and development projects. They first joined forces on research projects in 2006, working on Mono-column (cylindrical) Floating Production, Storage, and Offloading (FPSO) systems. The studies have been completed successfully and show promising results.

The technical feasibility study will be carried out by a Japanese consortium which will include Furukawa Electric Co. Ltd. Its brief is to develop a flexible pipe design for offshore oil production in ultradeep waters in the pre-salt cluster. The study is scheduled for completion in December 2014.

After project technical validation, the possibility of setting up a production plant in Brazil will be evaluated.

[mappress]

Source:Petrobras , May 12, 2011;