China: Boluomiao Shipyard Completes Repair of “HANG DAO JUN 1”

Boluomiao Shipyard Completes Repair of HANG DAO JUN 1

Recently after the successful repair & conversion of a number of high tech multi-purpose vessels at the Boluomiao shipyard, one large dredger ship named “HANG DAO JUN 1“sailed out at 7:00 AM, Nov. 5th after finishing her survey.

In face of the lack of man power and short time limit, daily meeting was continuously held at 3:00 PM onboard to collect all the quality and technical problems.

The major jobs of this vessel included 2 sets of main engine maintenance, pumps overhauling, oil separator overhauling, piping renewal, docking survey and some steel work.

[mappress]

Press Release, November 15, 2012