LNG Tanker Scheduled at Bilbao Terminal March 19 (Spain)

LNG Tanker Scheduled at Bilbao Terminal March 19

Spain’s Bilbao import terminal is scheduled to receive a shipment of LNG from Peru on March 19, according to shipping data.

The cargo is being carried by the Castillo de Santisteban liquefied natural gas carrier, with a capacity of 173,600 cubic metres.

The LNG carrier departed from Peru LNG terminal on February 26.

Bilbao terminal facilities have a storage capacity of 300.000 m3 of LNG, and a production rate of 800.000 Nm3/h.

The terminal was commissioned in 2003.

[mappress]
LNG World News Staff, March 5, 2012; Image: MAN Diesel