Rong Doi with Drilling Rig in place
Ensco 107 is now jacked up and the cantilever drilling derrick positioned over the wellhead to continue with the drilling program.
Ensco 107 is now jacked up and the cantilever drilling derrick positioned over the wellhead to continue with the drilling program.