10000 results found for 'Denmark'

10000 results found for 'Denmark'
Order results by

A list of search results

  • 1 July 2013
    Business & Finance

    MAN Diesel & Turbo unveiled ME-LGI concept signals impending, further expansion of MAN B&W dual-fuel portfolio. Ole Grøne, Senior Vice President – Low Speed Promotion & Sales – MAN Diesel & Turbo, said: “We can really see the momentum towards dual-fuel operation building now. The ME-GI engine we introduced – and immediately received orders for […]

  • 21 March 2013
    Business & Finance

    In April 2012, the auditors of public accounts asked Rigsrevisionen – the Danish National Audit Office – to investigate DONG Energy’s electricity prices and some of the aspects affecting the electricity price. The auditors of public accounts published their report Wednesday afternoon. The report determines that DONG Energy’s prices: have been in line with the […]

  • 17 May 2011
    Business & Finance

      Bookings can now be made for one of the most significant events in the offshore wind industry – the Offshore Wind International Business2Business Event 2011 in Esbjerg, Denmark, on November 9. OWIB 2011 is business’s version of speed dating and gathers developers, manufactures, suppliers, consultants and knowledge institutions from wide range of offshore wind […]

  • 17 May 2011
    Business & Finance

      Bookings can now be made for one of the most significant events in the offshore wind industry – the Offshore Wind International Business2Business Event 2011 in Esbjerg, Denmark, on November 9. OWIB 2011 is business’s version of speed dating and gathers developers, manufactures, suppliers, consultants and knowledge institutions from wide range of offshore wind […]

  • 5 January 2012

    In 2010, DONG Energy performed detailed geophysical surveys of the seabed in the wind farm area. In connection with the surveys, a few objects with magnetic signs, indicating that it might be old bombs, were located.. In connection with the surveys, a few objects with magnetic signs, indicating that it might be old bombs, were […]

  • 29 August 2012

    On Friday afternoon, August 24, the employees at Bladt finished the two transition pieces that the company has fabricated for DONG Energy. The two 350 tonnes transition pieces and the monopiles, each 406 tonnes of weight, make up the foundations for two of Siemens’ new 6 MW wind turbines that will be tested at Gunfleet […]

  • 5 October 2011

      The personnel are working flat out to complete the O&M buildings at Grenaa Harbour. The assembly of the elements for the future welfare and administration building is almost complete, and the shape of the building now looks like the outline on the site sign. The next step is the light external wall on the […]

  • 5 March 2012
    Business & Finance, Operations & Maintenance

    It is said that the sea erases all tracks; however, there is equipment which can see through the water, and one of the tools, which can give you an impression of the conditions at the seabed, is a so-called multibeam. The multibeam is a device, which can give you an exact picture of the surface […]

  • 20 May 2011
    Business & Finance

    At a major event at its Diesel Research Centre in Copenhagen Thursday, MAN Diesel & Turbo presented its ME-GI gas engine to a 300-strong invited audience of customers, licensees and journalists. The unveiling of the two-stroke engine represents the culmination of many years’ work that began in the 1990s with the company’s prototype MC-GI dual-fuel […]

  • 12 February 2013
    Business & Finance, Operations & Maintenance, Project & Tenders

    International certification and classification society, the RINA Group, has been awarded a contract with the Danish company Femern A/S for the verification of the railway interoperability and safety requirements of the Fehmarnbelt Fixed Link. That is an underwater tunnel that will link Germany and Denmark. Through its size, scale and complexity it will be among […]

  • 2 October 2024
    Business & Finance, Business Developments & Projects

    Axess Technologies has secured a cable installation contract with HSM Offshore Energy for the Thor offshore wind farm located off the Danish west coast. The scope of work includes project management, engineering, pulling, terminating, and testing the internal platform cables into the Thor offshore substation topside, covering both 66 kV and 275 kV cable systems. […]

  • 2 July 2012

    Four years after its market release in May 2008, the VTA reference list exceeds 100 entries, covering the TCR20, TCA55, TCA66, TCA77 and TCA88 turbocharger frame-sizes. As such, VTAs are installed on four-stroke gas engines and medium- and large-bore two-stroke diesel engines powering bulkers, tankers and container vessels to support ship operators’ part-load or slow-steaming […]

  • 6 February 2013
    Business & Finance

    When the three installation vessels are in simultaneous operation, approximately 300 people are working in the wind farm. Besides the people involved in the wind turbine installation, the wind turbines already installed are being commissioned and inspected, and the last interconnecting cables in the northern part of the wind farm are being flushed into the […]

  • 10 February 2011
    Storage

    ABB, the leading power and automation technology group, has won an order worth about $180 million from utilities Statnett of Norway and Energinet.dk of Denmark to supply an HVDC Light® (high-voltage direct current) converter solution to support the interconnection of the Norwegian and Danish power grids.The 500 kV (kilovolt) link is a new record in […]

  • 15 March 2021
    Authorities & Government, Business & Finance, Environment, Outlook & Strategy, Research & Development, Transition

    Denmark has joined as a co-sponsor of the proposal to create a $5 billion International Maritime Research and Development Board (IMRB) was submitted to the UN’s International Maritime Organisation (IMO). The proposal was submitted on the 10th of March 2021 by Georgia, Greece, Japan, Liberia, Malta, Nigeria, Palau, Singapore, and Switzerland. The World Shipping Council expects more […]

  • 4 April 2012

    New fuel-saving and energy-efficient propulsion opportunities are available from the MAN Alpha propeller programme, which now fully integrates the Kappel tip fin propeller blade designs for both controllable pitch propellers and fixed pitch propellers. On 20 March 2012 the board of MAN Diesel & Turbo approved the company’s take-over of Kappel propeller – including designs, […]

  • 12 March 2012

    Anders Eldrup will resign from his role as CEO of DONG Energy. He will do so bymutual consent. Fritz Schur, Chairman of the Board of Directors, states: ”Anders Eldrup has made a huge contribution to DONG Energy for eleven years andis handing over a strong, well-run company. I wish him good luck with his new […]

  • 29 January 2013
    Business & Finance, Operations & Maintenance

    New Year’s Eve 2011, 19.00 hours: the rest of Denmark is gathered for their celebrations. The installation vessel ‘Svanen’ is hammering a foundation pile into the seabed approximately 20 kilometres north east of Grenaa. The pile marks the beginning of construction of DONG Energy’s new facility, Anholt Offshore Wind Farm. In June 2012, the cable-laying […]

  • 5 May 2023
    Business Developments & Projects, Research & Development

    Energinet and 50Hertz have issued a periodic indicative notice to carry out a market investigation on the planned procurement of cable systems regarding the Bornholm Energy Island (BEI) project for establishing the required cable connections from/to Bornholm. This market investigation is a process that aims at the interaction between employers and potential suppliers prior to […]

  • 23 November 2012
    Storage

    Danish and UK energy ministers discussed the development of a subsea cable between the countries as a project of major importance for renewable energy, Subsea UK reports. Denmark is considering the increase of links to foreign electricity markets as it prepares for the growing role of alternative solar and wind sources, according to Bloomberg. This […]

  • 23 November 2012
    Storage

    Danish and UK energy ministers discussed the development of a subsea cable between the countries as a project of major importance for renewable energy, Subsea UK reports. Denmark is considering the increase of links to foreign electricity markets as it prepares for the growing role of alternative solar and wind sources, according to Bloomberg. This […]

  • 28 March 2011
    Business & Finance

    A consortium consisting of PensionDanmark and PKA has signed an agreement with DONG Energy on the acquisition of 50 per cent of the Anholt offshore wind farm for a price of app. DKK 6 billion. PensionDanmark is lead investor in the consortium and will acquire a 30 per cent interest, while PKA will acquire a […]

  • 10 January 2012
    Research & Development, Technology

    With a new and innovative technology, it is now possible to comply with exciting legislation on noise reduction during installation of offshore wind turbines. According to legislation from the EU the sound emissions from the installation of windmills at sea must be reduced so the threat to the marine mammals are minimised. Traditionally, the water […]

  • 9 April 2013

    Bladt Industries are establishing a production site at Lindø Industrial Park based on another significant order for foundations for offshore wind. At Lindø, the company will have more than 30,000 square meters of production halls at our disposal and will create dedicated production lines for serial production of jacket foundations for offshore wind turbines. The […]

  • 9 February 2012

    Ballast tank corrosion is a major worry for shipowners as it can lead to structural failure. But corrosion repair usually means taking a ship out of service for dry dock repair. With Hempel’s new Hempadur EM (Easy Maintenance) 35740 corrosion spots can easily be fixed – even at sea. Hempadur EM 35740 is a new […]