738 results found for 'heron'

738 results found for 'heron'
Order results by

A list of search results

  • 11 June 2025
    Environment, Market Outlooks, Outlook & Strategy, Transition

    Offshore green hydrogen production in the German Bight may affect the North Sea’s marine environment, according to a new study by German research institute Helmholtz-Zentrum Hereon that highlights how waste heat from electrolysis could alter local water temperatures and sea stratification.

  • 6 November 2025
    Business & Finance, Business Developments & Projects, Operations & Maintenance, Project & Tenders

    Norway-based energy services provider Aker Solutions has won a multi-year brownfield services assignment with ExxonMobil Canada, a subsidiary of the U.S.-headquartered energy giant ExxonMobil.

  • 31 October 2025
    Business Developments & Projects, Exploration & Production, Operations & Maintenance, Outlook & Strategy, Project & Tenders, Research & Development, Technology, Transition

    Danish technology company Topsoe has inaugurated its first solid oxide electrolyzer cell (SOEC) stack manufacturing facility in Herning, Denmark.

  • 28 October 2025
    Business & Finance, Business Developments & Projects, Exploration & Production

    Petrobras has confirmed a new production milestone, as a floating production, storage, and offloading (FPSO) unit, owned by the Netherlands-based SBM Offshore, shatters output ceiling in a record-breaking run at a huge field in the pre-salt Santos Basin off the coast of Brazil.

  • 28 October 2025
    Business Developments & Projects, Collaboration, Exploration & Production, Outlook & Strategy, Project & Tenders, Research & Development, Technology

    Danish technology company Topsoe has signed an offtake agreement to provide its solid oxide electrolyzer cell (SOEC) technology for Spanish shipping and chemicals company Forestal del Atlántico’s Triskelion e-methanol plant in Galicia, Spain.

  • 15 April 2025
    Business Developments & Projects, Collaboration, Exploration & Production, Outlook & Strategy, Project & Tenders, Research & Development, Technology, Transition

    Worley has entered into a collaboration with Topsoe to accelerate standardized, modular e-methanol production plants in the U.S. Midwest.

  • 9 July 2015
    Business & Finance, Equipment, Technology

    Auckland-based marine construction and dredging company, Heron Construction Ltd., has taken delivery of its two new 1200m³ Split Hopper Barges. The new SHB’s come as a timely addition to the Heron’s Australian fleet that is currently carrying out dredging operations throughout Victorian waters. The SHB’s are fitted with Bow Thrusters that represent Heron’s dedication not only to production, but dedication […]

  • 29 October 2014
    Business & Finance

    MEO Australia Limited has advised that Eni Australia Limited has elected not to drill an additional well on the Heron structure and will therefore withdraw from the Heron Area of NT/P68, offshore Australia.  As a consequence, MEO will regain a 100% Participating Interest in the Heron Area. MEO says that Eni has also elected not […]

  • 6 December 2017
    Business & Finance

    The towering spuds of a hired backhoe dredger will be visible at Eastland Port this week as maintenance dredging in front of wharf 7 and 8, and in the navigation channel begins, Eastland Group said in their latest announcement.  The 32 meter high spuds, or anchors, are part of a GPK backhoe dredge hired from Heron Construction. The dredging is […]

  • 29 October 2014

    MEO Australia will regain 100% Participating interest in Heron Area after Eni Australia decided to not drill additional wells.

  • 25 March 2013

    MEO Australia Limited has executed binding amendments to the NT/P68 Farm-in Agreement (FIA) dated 17th May 2011 to extend the second Heron well notice date to 18th December 2013.  This extension allows additional studies to be undertaken, the costs of which will be borne by Eni. The deadline for completion of the second well in the event Eni elects to drill […]

  • 14 November 2012

    MEO Australia provided an update in relation to Heron South-1 being drilled in NT/P68, operated by Eni Australia. Since the last report the 178m (7”) liner has been cemented in place to 4,255mMDRT. The forward plan is to clean out the wellbore prior to installing a 114mm (4½”) slotted liner. Eni has advised that it […]

  • 7 December 2015
    Business & Finance, Vessels

    New Zealand dredging contractor, Heron Construction Co Ltd. celebrated last Friday, December 4th, a keel-laying ceremony for the new dredger that is being built in China. The dipperdredger is under construction at Qinhuangdao China Harbor Shipbuilding Industry Co. and is expected to be ready for transport to New Zealand by the summer of 2016 where she will […]

  • 4 September 2012

      MEO Australia announced that on Monday 3rd September, Eni Australia, as operator of the NT/P68 exploration permit, had drilled the Heron South-1 610mm (24”) hole to a depth of 1330mMDRT. The 20” casing has been run and cemented at 1,310m. There have been no incidents and well operations are proceeding according to plan. Eni […]

  • 15 March 2011

      MEO Australia Limited announced that it has accepted a conditional offer from its preferred farminee for farmin to NT/P68. Negotiations are currently underway to convert the offer into binding agreements which will be subject only to Australian regulatory approvals. MEO currently holds 100% of the 5,900 km2 NT/P68 exploration permit containing the Heron and […]

  • 18 September 2012

    MEO Australia announced that on Monday Eni Australia as operator of the NT/P68 exploration permit had run and cemented the 340mm (13 3/8”) casing to 3,007mMDRT (metres Measured Depth below Rotary Table), drilled the 311mm (12 ¼”) hole out of casing to 3,018mMDRT and conducted a formation integrity test, prior to preparing to drill ahead. […]

  • 11 September 2012

    MEO Australia announced that yesterday, Eni Australia  as operator of the NT/P68 exploration permit had drilled the Heron South-1 445mm (17½”) hole to a depth of 2,914mMDRT (metres Measured Depth below Rotary Table). There have been no reportable incidents and well operations are proceeding according to plan. Eni plans to drill the 445mm (17½”) hole […]

  • 4 May 2020
    Business & Finance, Project & Tenders

    HEB construction and Napier Port have restarted building Hawke’s Bay’s biggest wharf, which will allow the region to welcome more and larger ships. According to the port, HEB Construction are back on track to start piling this week. As mentioned in the March update, the wharf will be supported by nearly 400 concrete piles that […]

  • 26 January 2012
    Business & Finance

      Yesterday, January 25, Marine Well Containment Company (MWCC) was recognized with the Blue Heron Award from the Louisiana Mid-Continent Oil and Gas Association (LMOGA) during the association’s annual meeting in New Orleans. Created in 1993, the award recognizes exceptional environmental stewardship in association with oil and gas activity. Specifically, MWCC was honored for the […]

  • 13 February 2013

    MEO Australia Limited advises that it has agreed to extend the second Heron well election deadline to 1st March 2013. Under the terms of the NT/P68 Farm-in Agreement (FIA) dated 17th May 2011, Eni had 60 days from the completion of the Heron South-1 well (14th December 2012) to elect whether to drill a second […]

  • 27 August 2012

    MEO Australia Limited advises that Eni Australia Ltd (Eni) as operator of the NT/P68 exploration permit has confirmed that the ENSCO 109 drilling rig was handed over on 15th August and arrived at the Heron South-1 location on 18th August. The well was spudded at 19:15hrs (Darwin time) on the 24th August 2012 and is […]

  • 15 August 2014
    Project & Tenders

    Italian oil giant, Eni, has reached an agreement with Australia’s MEO, to put off its Heron well decision.

  • 3 October 2012

    MEO Australia Limited advises that at 0600 Darwin time on Tuesday 2nd October, Eni Australia Ltd (Eni) as operator of the NT/P68 exploration permit had drilled the 311mm (12 ¼”) hole from 3,740m to 3,828mMDRT (metres Measured Depth below Rotary Table), run logs, installed and cemented 244mm (9 5/8”) casing to 3,818mMDRT. There have been […]

  • 6 August 2012
    Business & Finance

    MEO Australia Limited advises that Eni Australia Ltd (Eni) as operator of the NT/P68 exploration permit has confirmed that it will take over the ENSCO 109 drilling rig on 15th August and after an anticipated 4 day tow the rig expects to arrive at the Heron South-1 location on or around the 19th August. Eni […]

  • 21 February 2014
    Business & Finance, Equipment, Technology

    On July 26 2012, Caltex announced that the Kurnell Refinery Facility would be converted into a major Import Terminal. In order to achieve this goal, major works on the Refinery site and at the Kurnell Crude and Products Wharf were scheduled to take place to allow for a greater import capacity of products. As part […]