2717 results found for 'monopiles'

2717 results found for 'monopiles'
Order results by

A list of search results

  • 20 August 2018
    Environment, Research & Development, Technology

    The Fistuca BLUE 25M hammer has completed its offshore test in the Netherlands as part of the Offshore Wind Accelerator BLUE PILOT project.

  • 27 March 2013
    Business & Finance, Equipment, Operations & Maintenance, Project & Tenders

    Ballast Nedam has signed a contract for the installation of foundations at the German EnBW Baltic 2 offshore wind farm with ARGE BALTIC 2 Foundations, a joint venture between HOCHTIEF Solutions AG, GeoSea N.V. and HOCHTIEF Offshore Crewing GmbH. Ballast Nedam will erect the project’s 39 monopile and transition piece foundations and provide the logistics […]

  • 30 April 2012
    Business & Finance

    Jumbo’s DP2 heavy lift vessel Jumbo Javelin has successfully installed the first Transition Pieces (TPs) for the Anholt Offshore Wind Farm in Denmark. The operation was performed as planned with respect to every detail: transport, installation, accessibility of the TP, grouting and safety. Once again Jumbo proved to have an efficient concept for the transport […]

  • 28 May 2019

    EEW Offshore Structures Britain has produced the first transition piece for the Borssele 1&2 offshore wind farm in the Dutch North Sea. The Teesside-based company rolled out the first of 35 transition pieces destined for Ørsted’s Borssele 1&2 project at the beginning of April. EEW SPC, the parent company of EEW OSB, is in charge of manufacturing 47 monopiles […]

  • 27 March 2019
    Storage

    The jacket foundation for the Deutsche Bucht offshore substation has arrived at the installation site in the German North Sea and will be installed as soon as there is a suitable weather window, a spokesperson for Northland Deutsche Bucht GmbH told Offshore WIND. The substation topside has been towed from Vlissingen to Eemshaven in the Netherlands, as the […]

  • 19 April 2019
    Storage

    Jack-Up Barge’s vessel JB-115 has commenced work on the offshore substation of the Deutsche Bucht offshore wind farm in Germany. The Dutch company is responsible for the hook-up and commissioning services of the offshore substation at the 269MW project. The substation’s jacket foundation and topside were installed at the offshore site by heavy lift vessel Seaway […]

  • 22 April 2019

    Senvion has shared a video showing the Beleolico project in Italy, the first offshore wind farm in the Mediterranean Sea. The German wind turbine manufacturer concluded the contract to provide ten of its 3.0M122 turbines for the 30MW project at the beginning of March. The units will be installed in front of Taranto harbor in the Apulia region, […]

  • 20 January 2016
    Operations & Maintenance

    Siemens has released a video showing what level of precision was needed to install 48 foundation posts at the 144MW Westermeerwind offshore wind farm, situated in the Ijsselmeer, an artificial lake in the central Netherlands. Siemens installed the first monopile foundation in March 2015, and proceeded to install the remaining 47 throughout April and May. The 35-meter long foundation piles, […]

  • 17 January 2020
    Project & Tenders

    Bijlsma Constructies has won a contract to deliver 89 internal platforms for the Windpark Fryslân nearshore wind farm project in the Netherlands. The Dutch company will start production in March and is expected to complete all the platforms in July. Windpark Fryslân is being built by Zuiderzeewind, a consortium of Van Oord and Siemens Gamesa […]

  • 17 February 2017
    Equipment

    Siemens Wind Power has secured a contract to provide complete offshore wind power plant solutions including foundations for the EnBW Hohe See offshore wind farm. Starting in early 2018, the Hohe See wind farm will be installed at a site 90 kilometers north of the German island Borkum in the North Sea at water depths of up to […]

  • 22 December 2014
    Business & Finance, Equipment, Operations & Maintenance

    Subsea pile driving specialist MENCK, an Acteon company, is providing the largest and most powerful hydraulic hammer in the world to assist Bilfinger Marine & Offshore Systems with the installation of sub-sea foundations for Project Sandbank, a new 72 turbine strong wind farm in the North Sea. Known as the ‘Gentle Giant’, the MENCK MHU […]

  • 26 August 2015
    Storage

    The first two Vos Prodect’s monopile entry systems (Pro-MES) have been installed by Van Oord, at Gemini offshore wind farm project by the end of week 32. Pull-in of both first end and second end of the cable were completed on schedule and without any problems. Pro-MES systems have been tailored to the specific requirements […]

  • 26 August 2015
    Storage

    The first two Vos Prodect’s monopile entry systems (Pro-MES) have been installed by Van Oord, at Gemini offshore wind farm project by the end of week 32. Pull-in of both first end and second end of the cable were completed on schedule and without any problems. Pro-MES systems have been tailored to the specific requirements […]

  • 27 March 2015
    Business & Finance

    Following AMBAU’s announcement about winning a Nordsee Ost job, the company awarded Ilsenburger Grobblech GmbH (ILG), a subsidiary of Salzgitter AG, a contract for the delivery of around 47,900 tons of plate for monopiles and transition pieces for the “Nordsee One” offshore wind project. ILG will be delivering the plate to AMBAU’s production just in time in Bremen […]

  • 7 August 2018
    Ports & Logistics, Project & Tenders

    Trianel Windkraftwerk Borkum II GmbH has issued a tender for the provision of a guard vessel during the construction of the Trianel Windpark Borkum II wind farm in the German North Sea.

  • 30 April 2020
    Project & Tenders

    The last of the 90 transition pieces for the Triton Knoll offshore wind farm has been transported from Smulders’ Hoboken yard to the collection port. To remind, in September 2017, the Sif-Smulders joint venture secured a contract to manufacture the monopiles and transition pieces, as well as two foundations for offshore substations, for the 857 MW project. […]

  • 7 September 2016
    Equipment

    Cranemaster has introduced a new passive heave compensator (PHC). Safe working load (SWL) for the new unit is 1000 tonnes and maximum stroke length is 4000 millimeters. The unit itself weights more than 60 tonnes. “As offshore installations have become more complex and structures heavier, we have responded to the demand for higher capacity by […]

  • 1 April 2020
    Project & Tenders

    The 252MW Deutsche Bucht offshore wind farm located in the German North Sea has achieved full project completion. Final completion marks the official end of construction and the start of the operational phase of the project. According to Northland Power, this also signifies that the terms required to satisfy the project lenders for term conversion […]

  • 9 March 2015
    Business & Finance

    Van Oord has awarded Vos Prodect Innovations with a contract for the design and supply of cable protection systems for the Gemini offshore wind project. This is the first project where Vos Prodect will utilize its recently developed Monopile Entry System (Pro-MES). The Pro-MES system will be installed into the J-tubeless foundations of Gemini offshore […]

  • 11 March 2015
    Technology

    At the EWEA Offshore 2015 in Copenhagen, the Dutch company KCI has presented its Double Slip Joint (DSJ) concept to the offshore wind community. KCI’s DSJ is a patented solution to replace grouted or bolted connections between monopile and transition piece. With the DSJ, a simple alternative for a permanent non-moving rigid connection is now available. […]

  • 16 July 2015

    Two jacket foundations for the offshore substations to be installed at the Gemini wind farm site are on their way, the developer reported via social media.  A joint venture between Cofely Fabricom, CG and Iemants, is in charge of the two offshore substations and one onshore station for the project. Each offshore station will be linked to the onshore one by a […]

  • 30 July 2014

    Offshore WIND’s photo of the day: Loading of turbine blades for EnBW Baltic 2 wind farm in Sassnitz harbor. The wind turbine blades are being loaded onto HOCHTIEF’s jack-up vessel Vidar. With large deck space and 1,200-ton crane, the vessel can operate in water depths of up to 50 meters. Last month the first transition […]

  • 28 November 2016

    Bladt Industries has published a photo of one of the 60 transition pieces that the company will manufacture for the Arkona offshore wind farm. EEW SPC and Bladt are in charge of supplying the foundations for the project, with EEW delivering 60 monopiles and Bladt providing the transition pieces. Both companies started working on the project […]

  • 28 January 2020
    Project & Tenders

    Ørsted has contracted Manor Renewable Energy (MRE) to provide temporary power during the turbine commissioning phase at the Borssele 1 + 2 offshore wind project.

  • 27 May 2019

    The first external platform produced by Energomontaż-Północ Gdynia (EPG) for the 731.5MW Borssele 3 & 4 wind farm is ready for final outfitting, the Polish manufacturer said. In total, EPG will manufacture and deliver 76 external platforms for the project in the Dutch North Sea. The Borssele 3 & 4 wind farm is being developed by the Blauwwind […]