Shanghai: CIC Changxing Completes Repair of MV Bao Zhu Hai

China Shipping Industry (Shanghai Changxing) Co. Ltd. successfully finished the repair job for MV BAO ZHU HAI despite unfavorable weather conditions and heavy rain. Due to the strenuous efforts undertaken by the staff the vessel smoothly sailed away after 17 days’ repair.

The bulk carrier, built in 2004  belongs to Bao Zhu Hai Shipping Company and it is the second vessel from this shipping company to undergo repair at the shipyard.

The repair activities included work on the main engine repair, the pump and dry-docking items.

Vessel Specifications:

Length x Breadth: 289 m X 45 m

Gross Tonnage: 90091, DeadWeight: 180310 t

Draught: 8.4 m

Speed recorded (Max / Average): 13.6 / 13.4 knots

[mappress]
Press Release, October 24, 2012