Offshore regulator spots issues during Johan Sverdrup audit

Authorities & Government

Norwegian offshore safety watchdog, the Petroleum Safety Authority (PSA), has found irregularities during an audit of Equinor’s operations and barriers at the Johan Sverdrup field in the North Sea.

Johan Sverdrup; Source: Equinor

The PSA said on Wednesday that the audit of Johan Sverdrup was
done in three parts from January 2019 to January 2020.

The objective of the audit was to verify Equinor’s management and
follow-up of safe and robust solutions, barriers, information from the project
phase carried forward to operation and maintenance of the installations.

As far as the audit is concerned, it was conducted as an
interdisciplinary operational audit.

The regulator added that safe and robust solutions were a theme in
its previous audits of the Johan Sverdrup project. This includes Equinor’s
follow-up of the systems that contractors and suppliers have for the management
of health, safety and the environment and systems for learning and experience
transfer in the project.

The PSA also monitored the company’s follow-up of barrier management, including operational, and organisational barrier elements with associated performance requirements, in audits of holistic barrier management.

Issues found

According to the watchdog, two non-conformities were identified in
the audit, concerning verification of performance requirements for operational
and organisational barrier elements and governing documents at platform
start-up.

Also, the PSA found five improvement points regarding barrier
management, an overview of competence requirements, transfer of experience
between project and operations, alarm handling in a failure, hazard and
accident situation, as well as storage and follow-up of safety equipment in
switchrooms.

The PSA told Equinor to report by 17 April 2020 on how the
non-conformities would be addressed, and for its assessment of the improvement
points.

It is worth mentioning that the Johan Sverdrup field in the North Sea is expected to reach plateau production for the first phase in early May, which is earlier than anticipated.

Due to higher
plant capacity, plateau production would increase from around 440,000 barrels
of oil per day to around 470,000 barrels per day. Plateau production was
previously expected to be reached during the summer. At the end of March, daily
production had already exceeded 430,000 barrels of oil.

At plateau in
phase two, the field will produce 690,000 barrels of oil per day. Expected
recoverable reserves in the field are 2.7 billion barrels of oil equivalent.

Equinor is the
operator of the Johan Sverdrup field with a 42.6 per cent interest and its
partners are Lundin Norway with 20 per cent, Petoro with 17.36 per cent, Aker
BP with 11.5733 per cent, and Total with the remaining 8.44 per cent interest.