Fugro Starts Geotechnical Survey at Bay State Wind Site
RV Fugro Synergy has started a geotechnical survey at the site of DONG Energy’s proposed Bay State Wind offshore wind farm south of Martha’s Vineyard, Massachusetts, USA.
The survey is expected to be carried out in 15 days, weather permitting. During the survey, bottom conditions in 18 specific locations identified in the previous survey will be tested. This information will assist engineering of future wind turbines.
Fugro Synergy will use dynamic positioning systems to maintain station precisely while testing is taking place. This ground investigation will consist of a series of shallow Vibrocore Holes, Cone Penetration Tests (CPTs) and core samples.
Bay State Wind is a utility scale offshore wind farm, located 15 miles off the coast of Martha’s Vineyard, with water depths of between 130 – 165 feet. The site area was awarded by the Department of Interior’s BOEM in 2015 and additional feasibility assessment and stakeholder engagement, at both a local and state level will now be undertaken.
If given approval, DONG plans to build an offshore wind farm which could have an installed capacity of up to 1,000MW.
For the next three years, DONG Energy will collect data and perform assessments of the physical, biological and economic characteristics of the lease area. The geotechnical survey is the second step of data collection.
List of related news articles
-
Posted: 10 days ago
APEM and Vineyard Wind continue cooperation
Vineyard Wind has contracted APEM for the second year of surveys at its 800 MW offshore wind project...
Posted: 10 days ago -
Posted: about 1 month ago
Fugro hits IJmuiden Ver trifecta
Fugro has won three geotechnical investigation contracts for the 4 GW IJmuiden Ver wind farm zone in...
Posted: about 1 month ago -
Posted: 2 months ago
Fugro ready with Hollandse Kust West geotechnical data
Fugro has completed the geotechnical survey operations at the Hollandse Kust (West) offshore wind fa...
Posted: 2 months ago -
Posted: about 1 month ago
Fugro calls it a day at Mayflower Wind site
Fugro has completed a six-month site characterisation campaign at the Mayflower Wind project area of...
Posted: about 1 month ago