  • 14 May 2021
    Business Developments & Projects, Project & Tenders

    Large Diameter Drilling (LDD), an Acteon company, has signed a contract with DEME Offshore to deliver grouting services for the installation of foundations at the Saint-Nazaire offshore wind farm in France, where the first turbine foundation was recently installed. The wind farm, first such project to use drilled XL-monopile foundations, will consist of 80 GE […]

  • 11 February 2014

    The offshore wind energy industry is growing and several European ports have prepared, or are preparing, to provide the necessary logistics and storage services and facilities related to different construction & installation, O&M, and production phases of this industry. The wind farms are getting larger and moving into deeper waters further offshore resulting in bigger […]

  • 31 July 2012
    Business & Finance, Equipment, Research & Development

    DHI Group’s research into long-term scour predictions has borne fruit in the form of a specialty tool – WiTuS. With WiTuS, it is now possible to model long-term predictions on scouring around monopile type foundations – structures which form the bases of majority of the current and planned offshore wind farms. Offshore wind farm establishment […]

  • 3 October 2017

    On 29th September, the Dutch Minister of Economic Affairs, Henk Kamp, officially opened Sif’s new assembly and coating facility at the Maasvlakte 2 terminal in the Port of Rotterdam. 

  • 31 August 2015

    Nordergründe The 111MW Nordergründe offshore wind farm reached financial closure. The project developer WPD announced that it has secured funding for the next €410m phase of the wind farm. The funding includes loans from KfW IPEX-Bank and the European Investment Bank (EIB) and equity from WPD. Nordergründe will have 18 Senvion turbines installed 16km off the German coast in the Weser Estatuary, in water depths varying from […]

  • 12 May 2015
    Technology

    Conquest Offshore and deugro Denmark A/S, with the engineering companies Temporary Works Design (TWD) and Barge Master, have presented their newly developed installation system for monopiles, transition pieces (TPs) and pre-piling of jackets. The 136 by 36 meter Conquest MB1 barge is the perfect tool to execute this kind of work. Three monopiles and 3 to 16 transition […]

  • 12 February 2020
    Technology

    This is the first wind farm in the world to use drilled XL-monopile foundations, DEME said.

  • 3 October 2017

    On 29th September, the Dutch Minister of Economic Affairs, Henk Kamp, officially opened Sif’s new assembly and coating facility at the Maasvlakte 2 terminal in the Port of Rotterdam. 

  • 7 February 2012
    Business & Finance, Operations & Maintenance

    DONG Energy recently announced that 14 monopiles have been installed at Anholt Offshore Wind Farm. Since the first monopile was installed at 19.00hrs on New Year’s Eve, periods of good weather have been used to install foundations. On 1 February 2012, Svanen had erected 14 monopiles. Even though the January weather has been rough, it […]

  • 21 January 2020
    Technology

    Eager.one has, on behalf of Van Oord, designed and constructed a tool for the installation of anode cages from a floating vessel. The Anode Cage Installation Aid (ACIA) has now completed a factory acceptance test and will now be prepared for transport to the onshore harbour for commissioning and training of the Van Oord operational […]

  • 16 June 2014
    Business & Finance, Equipment

    Connector specialist First Subsea will be announcing a revolutionary cable connector for offshore wind turbines at Windforce 2014, Bremen (17-19 June). The Hang Off Connector reduces the time, cost and risk associated with offshore cable installation. Unlike traditional hang off devices, the First Subsea Connector provides an instant airtight structural connection to the lower deck, […]

  • 16 June 2014
    Technology

    Connector specialist First Subsea will introduce a revolutionary cable connector for offshore wind turbines at Windforce 2014 in Bremen (17-19 June). The Hang Off Connector reduces the time, cost and risk associated with offshore cable installation. Unlike traditional hang off devices, the First Subsea Connector provides an instant airtight structural connection to the lower deck, significantly reducing […]

  • 13 December 2018
    Business & Finance, Project & Tenders

    Dredging International has contracted Sif to produce the monopiles and, in joint venture with Smulders, the transition pieces for the SeaMade offshore wind farm in Belgium.

  • 23 May 2018
    Business & Finance, Ports & Logistics

    Haizea Wind Group (HWG) has inaugurated its wind tower manufacturing plant at the Port of Bilbao in Spain.

  • 13 June 2014
    Business & Finance, Equipment, Operations & Maintenance

    In just over 2 months Ballast Nedam Offshore has installed 47 out of 80 monopiles on the Butendiek Offshore Wind Farm. The installation works started at the 1st of April and on the 10th of June monopile no. 47 was installed. This demonstrates the reliable approach based on one of the best proven installation concepts […]

  • 8 April 2020
    Technology

    Dutch offshore foundations manufacturer Sif has upended the slip joint transition piece built for the Borssele V innovation site at its facility on Maasvlakte 2 in the Port of Rotterdam. The slip joint monopile is in the company’s storage area at Maasvlakte 2. The slip joint monopile foundation will support one of the two MHI […]

  • 17 March 2015

    Siemens kicked off Westermeerwind offshore wind farm construction by installing the first monopile foundation at the Ijsselmeer last week. ‘De Schelde’ pontoon, which serves for transport and installation of monopiles, has been fitted with the 11350 Liebherr crane, owned by Van Oord/Mammoet, for the job. The 35-meter long foundation piles, weighing around 250 tons, have been transported […]

  • 10 August 2015

    Only four months after introduction of the new bulk supplied offshore grout MasterFlow 9800 from BASF, the material is being used during the installation of the offshore foundations at the 600 MW Gemini Offshore Windpark. The specialized grouting equipment of FoundOcean and BASF’s MasterFlow 9800 was mobilized at the harbor of Eemshaven. After installation of the […]

  • 4 August 2014
    Business & Finance, Equipment, Operations & Maintenance

    TAG Energy Solutions has achieved a significant landmark in its project to produce foundations for the Humber Gateway offshore wind farm. North East England-based TAG Energy Solutions has undertaken the load out and sailaway of four 60-metre long, 650 tonne monopile foundations and four transition pieces, which are destined for the wind farm, which is […]

  • 7 March 2012

    Mabey Bridge – which opened its £38m wind turbine tower factory in May 2011 – has sealed its first offshore renewables contract. The deal – with Fugro Seacore – will see a 46m-long, 2.5m-diameter, 170-tonne monopile manufactured and delivered to E.ON. It will to be used as the foundation for a met mast for the […]

  • 18 December 2014
    Business & Finance

    Vattenfall and Stadtwerke München (SWM) have announced the start of manufacturing of the components for the Sandbank offshore wind farm. The fabrication of 72 steel monopile foundations for wind turbines has started at EEW Special Pipe Constructions GmbH in Rostock.  Depending on their location within the wind farm, monopiles will have a diameter of up to 6.80 meters and will […]

  • 20 October 2017
    Operations & Maintenance

    Vattenfall has informed that construction work is set to begin on Denmark’s largest offshore wind farm, Horns Rev 3, in October. The project will kick off with the Vattenfall’s installation of the first of a total of 49 foundations in the North Sea. “Horns Rev 3 is the first of three offshore farms that Vattenfall […]

  • 4 February 2015

    Nordenham residents are concerned the faith of neighboring Weserwind could also affect Steelwind. However, this is not the case for the recently established foundation production company writes NWZ Online. Dr. Ralf Hubo, director of Steelwind, revealed they will be busy until Summer 2016 with the production of monopiles with diameter of 7.8 meters. In September […]

  • 17 April 2018
    Ports & Logistics

    Swire Blue Ocean’s wind turbine installation vessel Pacific Osprey has installed the first monopile foundation on the 497MW EnBW Hohe See offshore wind farm in the German North Sea.

  • 7 September 2011

    In cooperation with Voith, Dutch Offshore Innovators BV, (DOI) developed together a new concept for economical operations of a wind turbine foundation installation vessel. The so-called TFliner concept is a move towards compact design and simplicity, which drastically reduces construction costs. An increase in operability is offered by the Voith Roll Stabilization (VRS) feature of […]