10000 results found for 'otc 2014'

10000 results found for 'otc 2014'
Order results by

A list of search results

  • 16 June 2015

    Northern Petroleum announced that the environmental impact assessments (EIA) for the company’s three remaining exploration permit applications in the southern Adriatic, offshore Italy, have been approved. These approvals are in addition to the two EIA approvals for exploration permit applications announced by the company on June 10, 2015. The EIA approvals have been received from […]

  • 27 November 2013

    Neon Energy Limited  has provided the following update regarding drilling operations at the Ca Ngu-1 exploration well, located in the Eni-operated Block 120, offshore Vietnam. As of 26 November drilling has reached the 13 3/8” casing point, at a depth of 607 metres. Once casing is set, Operator Eni will drill ahead through the upper […]

  • 23 November 2010
    Business & Finance

    Transport & Offshore Services- from Rotterdam, The Netherlands, is proud to deliver the Singapore Inspector for its new owners. The former Noordhoek Singapore (ex-Serviceman, ex-Smit Marlin and ex-Smit-Lloyd 61) will sail to start work in the Nigerian offshore oilfields as platform maintenance and inspection vessel. The delivery of the Singapore Inspector is turnkey with a […]

  • 6 May 2019
    Business & Finance, Project & Tenders, Vessels

    Nags Head’s beach nourishment is now underway with the Dredge Ellis Island pumping sand onto the beach just south of Limulus Street, reports the Town of Nags Head, NC. According to the report, the Town is conducting a 90-120 day-long beach nourishment maintenance project, which started May 1, 2019. The current schedule calls for the […]

  • 11 February 2016
    Business & Finance

    The Army Corps of Engineers has included $500,000 for the Georgetown Port in their work plan for the next year, according to a release from South Carolina Congressman Tom Rice. “I’m very pleased that the Army Corps recognizes the merit of the Georgetown Port project and has chosen to once again include the project in […]

  • 17 February 2016
    Business & Finance

    Forth Ports Limited announced today (17 February, 2016) plans to make the largest investment in the history of the Port of Dundee. The port owner is to invest more than £10 million to create a new quayside with an industry-leading “heavy lift” capability, coupled with a significant onshore operational area. The privately funded investment will […]

  • 11 November 2015
    Business & Finance

    The Oregon Department of Environmental Quality (DEQ) is proposing cleanup action for East Whitaker Pond, located within the Columbia Slough watershed. The proposed remedial action includes a combination of soil removal, dredging of contaminated sediments and placing a thin layer of clean material across the majority of the pond. In some locations, the clean material will include an […]

  • 24 November 2019
    Business & Finance

    Dredging Today brings you an overview of the most popular stories from the past week (November 18 – 24, 2019).   Avalon Beachfill Scheme Completed The hydraulic beach fill project for Avalon, NJ, undertaken by Great Lakes Dredge and Dock Company (GLDD), successfully concluded on Sunday, November 10th.   Elbe River Dredging Project Remains on […]

  • 12 December 2019
    Business & Finance, Vessels

    ML Dredging are back on the Beaulieu River for the dredging phase 2 of the £2 million re-development at Bucklers Hard Marina. The Marina is close to the historical 18th century UK shipbuilding site at Bucklers Hard and the new investment is seen as securing the future of the marina over the next 25 years […]

  • 7 March 2017
    Business & Finance

    The Environment Agency has started work on the £3.8 million scheme to reduce the risk of flooding to over 400 homes and businesses in Totnes. According to EA, the scheme involves improving existing flood defenses along the River Dart from the mainline railway bridge to the Steam Packet Inn. Other measures include providing a new […]

  • 8 April 2020
    Infrastructure

    Qatar Petroleum has delayed the production start from its LNG export project to 2025 as it faces bidding process delays. Speaking to Reuters, Saad Sherida Al-Kaabi, the Minister of State for Energy Affairs, the president and CEO of Qatar Petroleum, said the size of the project remains the same. This means the production capacity, once […]

  • 20 February 2019
    Business & Finance, Equipment

    Greenlink Interconnector has been awarded a €3.6-million funding by the European Commission to finance the development of the project. Greenlink was selected for a grant in the field of trans-European energy infrastructure under the Connecting Europe Facility (CEF Energy). Simon Ludlam, Project Director for Greenlink, welcomed the announcement: “Our success once again in attracting EU […]

  • 1 February 2019
    Business & Finance, Equipment, Operations & Maintenance

    Huawei Marine has completed the West Africa Cable System (WACS) Upgrade II. The project was signed in February 2018 and put into commercial use in October of the same year. The upgrade realized 32*100G wavelengths configured on the longest optically amplified single fiber span stretching 11500 kilometers from South Africa to Portugal. As the longest […]

  • 24 April 2018
    Equipment

    International manufacturer Roxtec has supplied a package of specialist cable sealing solutions for Beatrice offshore wind farm in Scotland. Roxtec UK marine and offshore director John Kayes said the firm delivered fireproof and watertight seals to Beatrice Offshore Windfarm Limited (BOWL) to secure high voltage cables on the wind farm substations. The £2.6 billion energy […]

  • 9 November 2016
    Business & Finance, Operations & Maintenance, Project & Tenders

    Saipem has been awarded new contracts and change orders in the E&C offshore segment, for an overall amount of about 1 billion dollars. In particular, the most significant are the notification of award by Saudi Aramco of two EPIC contracts (engineering, procurement, installation, construction), under the long-term agreement in force and renewed in 2015 until […]

  • 22 October 2013
    Business & Finance, Equipment, Technology

    Eye4Software B.V. has announced that the latest version of their Hydrographic Survey Package, Hydromagic version 5.2, has been released to the public. The main purpose of this software is to map the bottom of a river, reservoir or ocean in 3D, by using a (D)GPS or RTK positioning system combined with an echosounder. Once data […]

  • 24 April 2015
    Exploration & Production, Project & Tenders

    Falkland Oil and Gas Limited (FOGL) has informed that the 14/20-1 “Isobel Deep” well, offshore the Falkland Islands, has been temporarily suspended due to problems detected on the blowout preventer (BOP). According to FOGL, following the setting of the 13 3/8″ casing at a depth of 1273.9m metres, a problem was detected with the BOP. The […]

  • 25 August 2021
    Business & Finance, Project & Tenders

    Van Oord has awarded TKF with a contract to provide the inter-array cables for the Baltic Eagle offshore wind project in Germany. TKF is in charge of the production and delivery of approximately 79 kilometers of 66 kV inter-array cables and corresponding accessories. Van Oord’s cable-laying vessel Nexus and the trencher Dig-It will be used for the […]

  • 6 April 2018
    Business & Finance

    Bahri is transporting the first chemical shipment from Aramco Trading Company (ATC), a subsidiary of Saudi Aramco. 

  • 24 December 2019
    Business & Finance

    TOP Ships inked a financing deal with an undisclosed Chinese financier for its recently acquired two newbuilding duo.

  • 17 April 2019

    The road ferries are now undergoing fitting out before entering service in 2020.

  • 10 November 2011

    Recently, the Marketing Director of Yuexin Shipbuilding, Mr. Eric Lim ,signed a contract of two 77 m DP2 Offshore Support/ Oil Recovery Vessels. The vessel measures 77.8m in length with a molded breadth of 17.6m, a molded depth of 7.8m and the maximum draft is 6.4m. With 3600T dead weight, the vessel can carry 1100m3 […]

  • 11 December 2011

    Recently CIC Lixin Shipyard completed repairs for vessel MV Luzon Strait , the shipyard finished all the works and the vesssel sailed smoothly in a drizzle. The repair work was commenced on Nov. 18, which includes: all 5 cargo holds sand blasting and painting, large amount of pipes renewal in engine room, etc. There was a […]

  • 23 November 2012
    Business & Finance, Research & Development

    A seminar on RS survey of subsea pipelines was held with the RS organisational support in the town of Volzhsky, the Volgograd Region. Representatives of oil and gas industry including OOO LUKOIL-Nizhnevolzhskneft, Saipem S.p.A., OOO Volgograd NIPImorneft, Moscow Pipe-Coating Plant OJSC, ООО Neftegazdiagnostika, OOO Petroslav Gydroservis, etc. took part in the seminar. The seminar addressed […]

  • 30 July 2012
    Business & Finance

    Reederei NSB reports yesterday that MSC FLAMINIA and the accompanying group of tugboats have assumed a waiting position approximately 100 nautical miles off the British coast. While the team of firefighting experts is onboard MSC FLAMINIA, the vessel is not towed. Yesterday, a team of firefighting experts has again boarded MSC FLAMINIA. It is yet […]