List of the highlighted articles
Upgrading the Defenses in Essex
Work is underway on a £2 million scheme to refurbish the flood defense embankment in Stansgate, Esse...
Godalming Scheme Almost Done
Construction works on the Godalming Flood Alleviation Scheme are now in the finishing stages, accord...
Moving on with the Leeds Scheme
Survey works are starting at a listed bridge in Bradford, to create a detailed design to reduce floo...
River Trent Works Get Underway
Last Friday, June 28th, marked the official start of work on a major Environment Agency flood scheme...
Arundel Tidal Defenses on Display
The Environment Agency recently held two public information events at the Arundel Town Hall to updat...
Meeting on Exmouth Scheme
Exmouth residents will have a chance to learn more about planned improvements and construction work ...
VBA Appointed to EA Framework
VBA, a joint venture between VolkerStevin, Boskalis and Atkins, has been appointed to the Environmen...
York Scheme Gets Underway
A major milestone has been reached as construction work gets underway on the Environment Agency’s Yo...
Perry Barr Scheme on Display
The Environment Agency has just announced that people living near a flood scheme being built in Sand...
North Yorkshire Flood Protection
As the Environment Agency launches a consultation on its draft flood and coastal erosion risk manage...
VolkerStevin Joins Brunel's Center
VolkerStevin has partnered with Brunel University’s Center for Flood Risk and Resilience – set...
Efficient spare part management through mobile 3D printing in remote locations
In remote locations, the fast and reliable provision of spare parts is critical for the smooth syste...
Technical challenges with collection of subsea minerals for use in EV batteries can be overcome
Front-end engineering design study paves the way for development of new subsea mining riser system, ...
Great Yarmouth Work on the Way
Tidal defenses in Great Yarmouth are set to receive a £40.3 million refurbishment, according to the ...
Hull Flood Scheme Launched
Construction of one of the biggest flood defense schemes in the country was officially launched by t...
West Beach Project Kicks Off
The Environment Agency and Dorset Council have partnered up to work on a new multi-million pound sea...
Jackson Part of the NGSA
Jackson is one of only six contractors to be appointed to the Environment Agency’s Next Generation S...
LBM Scheme Starts Next Week
The Environment Agency’s Lincolnshire Beach Management (LBM) scheme gets underway on 13 May, reports...
Parrett Dredging on the Table
A public consultation is underway about proposals to dredge the River Parrett between Stathe and Bur...
New Strategy up for Comment
Environment Agency Chair, Emma Howard Boyd, has opened an 8-week consultation period on the recently...
Lincolnshire Plan up for Comment
The Environment Agency (EA) is launching a consultation on Monday, June 3rd on its new draft strateg...
Selly Park Scheme Operational
Work on a multi-million pound scheme to reduce the flood risk to over 150 homes and businesses in Se...
Atkins Part of EA New Framework
Atkins – a member of the SNC-Lavalin Group – has won a place on a new Environment Agency (EA) ...
Two Events on Arundel Defenses
The Environment Agency has analysed the results of the recent engineering surveys of the river defen...
The River Thames Scheme
The Environment Agency has just announced that the final outline design for the River Thames Scheme ...
Cockwood Scheme Officially Open
The Environment Agency today (April 5) officially marked the opening of £4.8 million Starcross and C...
£45M Shoreham Scheme Opened
The Environment Agency has officially opened over 7 kilometers of new river and sea defenses in the ...