List of the highlighted articles
Sandbridge Beachfill Progresses
The Sandbridge Beach Coastal Storm Damage Reduction Project’s 2020 renourishment cycle kicked off sa...
Schilling Point Dredging Proposed
The U.S. Army Corps of Engineers’ Norfolk District is seeking public input on a Virginia Beach...
Restart of Virginia Beach Project
Great Lakes Dredge & Dock LLC has restarted sand-placement operations along the Virginia Beach o...
Virginia Beachfill Resumes
While the Virginia Beach oceanfront renourishment operations will not restart before November 15, su...
GLDD to Resume Virginia Beachfill
The Army Corps’ Norfolk District and City of Virginia Beach officials have just announced that...
Virginia Beach Project Halted
Reinforcing nearly 75% of the oceanfront in roughly two months, the Virginia Beach Hurricane and Sto...
Virginia Beachfill in Full Swing
The Virginia Beach Hurricane and Storm Damage Reduction Project is moving forward, with 120,000 cubi...
Virginia Beach Work Kicks Off
The Virginia Beach Hurricane and Storm Damage Reduction Project, a joint effort by the city of Virgi...
GLDD Wins Sandbridge Contract
Although not even officially summer, the city of Virginia Beach and the Army Corps’ Norfolk Di...
GLDD Wins Virginia Beach Deal
The Virginia Beach oceanfront is getting some added protection, thanks to a joint effort by the city...
BOEM, USACE Ink Sandbridge Deal
The Bureau of Ocean Energy Management (BOEM), the USACE’s Norfolk District and the City of Vir...
Faccin Wind Towers Division: a reliable partner for your wind energy project
Faccin Group created a Wind Towers Division within the company. Why? Eng. Andrea Comparin: “Ac...
Maritime Insurance Market Update, Q3 2020
‘Clients, advisors and insurers are in the same boat.’ Effective cooperation is necessary to keep ri...
Thimble Shoal Deal for Manson
Manson Construction Co., a Seattle based company involved in dredging, waterfront construction, pier...
Dredge Murden Returns to VB
The US Army Corps of Engineers dredge, the Murden, returned to Virginia Beach on Monday evening and ...
Meeting on Lynnhaven Scheme
The U.S. Army Corps of Engineers’ Norfolk District (USACE) and the City of Virginia Beach are ...
It’s all about power flow
Integration of renewable energies on a ship – and in other island networks Interview with Jero...
ASBPA Award for Sandbridge
The Sandbridge Beach Restoration Project has been named by the American Shore and Beach Preservation...
Meeting on Lynnhaven Inlet Plan
The U.S. Army Corps of Engineers and the city of Virginia Beach announced the initiation of the Lynn...
Dredging Part of Dam Neck Project
A shore protection project at Naval Air Station Oceana at Dam Neck annex is expected to begin within...
“ETICA IP” ROV & USV a staunch green ally for the blue economy indystry & ocean sustainability
By Ioana Laura Grigore. Our concept of blue economy & ocean sustainability in offshore industry ...
UPDATE: Grounded Bulk Carrier Ornak Refloated
The U.S. Coast Guard oversaw the refloating of the 751-foot bulk carrier, Ornak, on Friday, April 18...
French warship begins final journey to Alang
An asbestos-insulated French aircraft carrier began the first stage of its controversial final voyag...