50Hertz Needs Engineers for Grid Connection Cluster West Adlergrund

50Hertz Transmission GmbH, a German transmission system operator, is looking for engineering services, onshore and offshore.

50Hertz Needs Engineers for Grid Connection Cluster West Adlergrund

50Hertz Transmission GmbH is responsible for the grid connection of offshore wind farms in the German part of the Baltic Sea. As part of the investment project “Offshore Grid Connection Cluster West Adlergrund (CWA)”, 50Hertz requires the supervision of cable laying and additional onshore and offshore engineering services to be carried out at different times during the period from January 2015 to end 2018 and be implemented in the form of a service contract.

A total of 7 positions are to be filled: 1. Engineer: construction management; 2. Project engineer: civil engineering and onshore cable laying; 3. Project engineer: surveying 4. Project engineer: ordnance recovery; 5. Project engineer: offshore cable laying flat water; 6. Project engineer: cable laying offshore deep water; 7. Project engineer: dredging.

Deadline for submission of bids is September 4, 2014.

Offshore WIND Staff, August 22, 2014; Image: oceanteam.nl (Illustration)