BP Upgrades Subsea Facilities on Schiehallion and Loyal Fields (UK)

 

On behalf of its co-venturers BP is pleased to announce an agreement to progress a major re-development of the Schiehallion and Loyal oil fields to the west of the Shetland Islands.

Schiehallion and Loyal have produced nearly 400 million barrels of oil since production started in 1998 and an estimated 450 million barrels of resource is still available. The investment of circa £3 billion in the re-development of the fields will take production out to 2035 and possibly beyond.

Trevor Garlick, Regional President for BP’s North Sea business, said: “This important milestone is consistent with BP’s strategy to sustain a material, high quality business in the North Sea region. The Schiehallion and Loyal oil fields are established assets with a strong future – and we and our co-venturers are taking some significant steps to maximise the greater potential we now see in these fields.

BP has developed a strong track record west of Shetland over the past two decades and will use the latest technology to maximise recovery from these fields.

The Quad 204 project involves replacing the existing Schiehallion Floating, Production, Storage and Offloading vessel with a new FPSO which is scheduled to be installed in 2015. The new vessel will be 270 metres long by 52 metres wide and able to process and export up to 130,000 barrels a day of oil, and store in excess of 1 million barrels.

There will also be a major investment in the upgrading and replacement of the subsea facilities to enable the full development of the reserves.

The new facilities are scheduled to commence production in 2016.

BP will have a 36.3 % ownership interest in the new FPSO, with other interests as follows: Shell (36.3 %); Hess Ltd (12.90 %); Statoil (UK) Ltd (4.84 %); OMV (UK) Ltd. (4.84 %) and Murphy Petroleum (4.84 %).

[mappress]

Source: BP, July 13, 2011;